Last Update: June 7, 2025 02:27 p.m.
Andrews St to Powers St
Expected Duration: 05 Jul 2023 - 11 Jun 2025
North side sidewalk, closed for building construction/maintenance.
Powers St to Salter St
Expected Duration: 12 Jun 2025 - 12 Jun 2025
All eastbound lanes, all westbound lanes, closed for block party.
Newmarket Bv to Pembina Hw SB to Abinojii Mikanah EB
Expected Duration: 27 May 2025 - 30 Sep 2025
Eastbound curb lane, eastbound median lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Eastbound median lane will be open for morning and afternoon rush hours.
St Annes Rd to River Rd
Expected Duration: 20 May 2025 - 16 Jun 2025
Eastbound curb lane, westbound median lane, closed for landscaping/tree maintenance. Eastbound curb lane will be open for afternoon rush hour. Westbound median lane will be open for morning and afternoon rush hours.
Abinojii Mikanah to Pembina Hw
Expected Duration: 15 Jun 2025 - 15 Jun 2025 03:00 p.m.
No cars, just cardio. Westbound curb lane closed for the Manitoba Marathon.
Boyd Av to Aberdeen Av
Expected Duration: 26 May 2025 - 06 Jun 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance. All southbound lanes will be open for morning rush hour.
Hartford Av to Perth Av
Expected Duration: 05 Jun 2025 - 06 Jun 2025
Southbound curb lane, closed for film production or special event/festival.
Inkster Bv to Lansdowne Av
Expected Duration: 12 May 2025 - 15 Aug 2025
All lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance. At least one sidewalk to remain open at all times.
Inkster Bv to Lansdowne Av
Expected Duration: 20 May 2025 - 15 Aug 2025
All southbound lanes, all northbound lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
Bannatyne Av to McDermot Av
Expected Duration: 18 Mar 2025 - 31 Oct 2025
Patio installed on the east sidewalk; pedestrian access remains open.
Notre Dame Av to McDermot Av
Expected Duration: 01 Apr 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
End to Oakdale Dr
Expected Duration: 20 May 2025 - 02 Jul 2025
All westbound lanes, all eastbound lanes, closed for street construction/maintenance.
Laura St to Ellen St
Expected Duration: 12 May 2025 - 09 Jun 2025
Eastbound curb lane, closed for gas work.
Lily St to Waterfront Dr
Expected Duration: 23 Mar 2025 - 31 Oct 2025
Patio installed on the Eastbound curb lane and south sidewalk; pedestrian access remains open.
Lulu St to Nora St
Expected Duration: 12 May 2025 - 09 Jun 2025
Westbound curb lane, closed for water work.
Martha St to Lily St
Expected Duration: 05 Jun 2025 - 08 Jun 2025
Eastbound curb lane, closed for film production or special event/festival.
Sherbrook St to Gwendoline St
Expected Duration: 11 Jun 2025 - 25 Jun 2025
Eastbound curb lane, closed for water work. Eastbound curb lane will be open for morning and afternoon rush hours.
Gagnon St to Buchanan Bv
Expected Duration: 02 Jun 2025 - 18 Jul 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
At Chancellor Dr
Expected Duration: 09 Jun 2025 - 05 Sep 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Verona Dr to Ambergate Dr
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. One lane to remain open at all times.
Verona Dr to Ambergate Dr
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Eastbound curb lane, closed for street construction/maintenance.
Amber Tl to Pipeline Rd
Expected Duration: 23 May 2025 - 30 Jun 2025
Local access lanes and north side sidewalk, closed for street construction/maintenance.
Lansdowne Av to Inkster Bv
Expected Duration: 12 May 2025 - 15 Aug 2025
All lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance. At least one sidewalk to remain open at all times.
Royal Av to Hartford Av
Expected Duration: 06 Jan 2025 - 13 Jun 2025
Southbound curb lane, closed for sewer work.
Logan Av to Dufferin Av
Expected Duration: 21 Nov 2023 - 01 Jan 2099
The bridge is closed indefinitely. End date is not applicable but is a requirement of the lane closure system.
Adele Av to Notre Dame Av
Expected Duration: 14 May 2025 - 09 Jun 2025
Northbound curb lane, closed for water work.
Bannatyne Av to Winnipeg Av
Expected Duration: 03 Jun 2025 - 13 Jun 2025
Southbound curb lane, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Dufferin Av to Stella Av
Expected Duration: 12 May 2025 - 09 Jun 2025
Northbound curb lane, east side sidewalk, closed for water work.
Ellice Av to Sargent Av
Expected Duration: 02 Jun 2025 - 20 Jun 2025
All northbound lanes, east side sidewalk, closed for water work.
Inkster Bv to Lansdowne Av
Expected Duration: 14 May 2025 - 15 Aug 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for street construction/maintenance.
Portage Av to St Matthews Av
Expected Duration: 19 May 2025 - 16 Jun 2025
Northbound curb lane, east side sidewalk, closed for water work.
St Matthews Av to Ellice Av
Expected Duration: 27 May 2025 - 27 Jun 2025
All northbound lanes, closed for electrical/lighting/signals work.
Scotia St to Marymound Wy
Expected Duration: 16 Jun 2025 - 08 Aug 2025
Eastbound curb lane, south side sidewalk, closed for water work.
Osborne St to Hay St
Expected Duration: 02 Dec 2024 - 20 Feb 2026
Eastbound curb lane, closed for building construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Morrison St to Iris St
Expected Duration: 29 May 2025 - 15 Jun 2025
Eastbound curb lane, closed for sewer work.
Verbena St to Iris St
Expected Duration: 31 May 2025 - 30 Jun 2025
Westbound curb lane, closed for sewer work.
Bannatyne Av to McDermot Av
Expected Duration: 15 Jun 2025 - 23 Jun 2025
Southbound curb lane, closed for film production or special event/festival.
McDermot Av to Bannatyne Av
Expected Duration: 21 Mar 2025 - 31 Oct 2025
Patio installed on the east sidewalk; pedestrian access remains open.
Wolever Av to St Matthews Av
Expected Duration: 27 May 2025 - 23 Jun 2025
Northbound curb lane, east side sidewalk, closed for water work. Northbound curb lane will be open for morning and afternoon rush hours.
Highfield St to Lyndale Dr
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, west side sidewalk, east side sidewalk, closed for street construction/maintenance.
Cavalier Dr to Lumsden Av
Expected Duration: 09 Oct 2024 - 22 Nov 2024
Southbound curb lane, closed for loading/unloading. Southbound curb lane will be open for morning and afternoon rush hours.
Navy Wy to Garry St
Expected Duration: 14 Mar 2025 - 31 Oct 2025
Patio installed on the south sidewalk; pedestrian access remains open.
Riveroaks Dr to Parkview St
Expected Duration: 02 Jun 2025 - 28 Jul 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Cottonwood Rd to Betournay St
Expected Duration: 02 Jun 2025 - 20 Jun 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance.
Afton Rd to Keslar Rd
Expected Duration: 03 Jun 2025 - 20 Jun 2025
Southbound curb lane, closed for street construction/maintenance.
At Point West Dr
Expected Duration: 11 Jun 2025 - 07 Jul 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
At Newmarket Bv
Expected Duration: 09 Jun 2025 - 10 Jun 2025
All westbound lanes, all eastbound lanes, north side sidewalk, closed for building construction/maintenance. All westbound lanes will be open for morning and afternoon rush hours. All eastbound lanes will be open for morning and afternoon rush hours.
Sargent Av to Cumberland Av
Expected Duration: 14 May 2025 - 09 Jun 2025
Northbound curb lane, closed for gas work.
Hay St to Osborne St
Expected Duration: 08 Jun 2025 - 09 Jun 2025
Westbound curb lane, north side sidewalk, closed for film production or special event/festival.
Adelaide St to Princess St
Expected Duration: 12 Dec 2024 - 15 Jan 2026
Westbound median lane, closed for loading/unloading.
Albert St to King St
Expected Duration: 16 Jun 2025 - 23 Jun 2025
Complete closure of all westbound lanes, north side sidewalk, closed for film production or special event/festival.
Princess St to Adelaide St
Expected Duration: 09 Jun 2025 - 30 Jun 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Rorie St to Main St
Expected Duration: 18 Mar 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Rorie St to Waterfront Dr
Expected Duration: 22 Apr 2025 - 31 Aug 2025
Back lane/public lane, south side sidewalk, closed for building construction/maintenance.
Waterfront Dr to Main St
Expected Duration: 08 Jun 2025 - 14 Jun 2025
Westbound curb lane, westbound median lane, south side sidewalk, closed for film production or special event/festival.
Waterfront Dr to Rorie St
Expected Duration: 06 Sep 2022 - 30 Jun 2025
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Waterfront Dr to Rorie St
Expected Duration: 06 Jun 2025 - 06 Jun 2025
All westbound lanes, westbound painted bike lane, closed for building construction/maintenance. All westbound lanes will be open for morning and afternoon rush hours.
Waterfront Dr to Rorie St
Expected Duration: 09 Jun 2025 - 14 Jun 2025
Westbound median lane, closed for film production or special event/festival.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Einarson Av to Portage Av
Expected Duration: 04 Jun 2025 - 16 Jun 2025
East side sidewalk, west side sidewalk, closed for sewer work. Only one sidewalk closed at a time.
Notre Dame Av to Wellington Av
Expected Duration: 09 Jun 2025 - 16 Jun 2025
Southbound curb lane, closed for loading/unloading.
Pulberry St to St Marys Rd
Expected Duration: 20 May 2025 - 27 Jun 2025
All eastbound lanes, south side sidewalk, closed for street construction/maintenance.
At Crane Av
Expected Duration: 30 May 2025 - 09 Jun 2025
All lanes, closed for sewer work. Local traffic will be maintained.
Clayton Dr to St Annes Rd
Expected Duration: 03 May 2025 - 09 Jun 2025
Westbound curb lane, closed for sewer work.
Beaverhill Bv to End
Expected Duration: 12 May 2025 - 06 Jun 2025
All lanes will be closed intermittently for street construction/maintenance between the posted dates. Local traffic will be maintained.
At Beaverhill Bv
Expected Duration: 12 May 2025 - 06 Jun 2025
All lanes will be closed intermittently for street construction/maintenance between the posted dates. Local traffic will be maintained.
Alexander Av to Logan Av
Expected Duration: 16 Jun 2025 - 25 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for street construction/maintenance.
Taylor Av to Mathers Av
Expected Duration: 10 Jun 2025 - 11 Jul 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance.
At Wood St
Expected Duration: 21 May 2025 - 27 Jun 2025
South side sidewalk, closed for building construction/maintenance.
Powers St to McGregor St
Expected Duration: 02 Apr 2025 - 13 Jun 2025
Westbound curb lane, closed for sewer work.
Lilac St to Cockburn St S
Expected Duration: 12 May 2025 - 09 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Herbert Av to Cosmo Pl
Expected Duration: 13 May 2025 - 09 Jun 2025
Southbound curb lane, closed for street construction/maintenance.
Ellice Av to Sargent Av
Expected Duration: 21 May 2025 - 15 Jun 2025
All northbound lanes, northbound painted bike lane, closed for sewer work.
Sargent Av to Wellington Av
Expected Duration: 29 May 2025 - 23 Jun 2025
All northbound lanes, closed for gas work.
Market Av to James Av
Expected Duration: 20 Jun 2025 10:00 a.m. - 20 Jun 2025 11:59 p.m.
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Ellice Av to St Matthews Av
Expected Duration: 09 Jun 2025 - 23 Jun 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Portage Av to St Matthews Av
Expected Duration: 29 May 2025 - 30 Jun 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for sewer work.
Pembina Hw to River Rd
Expected Duration: 05 Feb 2024 - 31 Dec 2025
Eastbound shoulder lane, closed for sewer work.
Centre St to Park East Dr
Expected Duration: 06 Jan 2023 - 29 Aug 2025
South side sidewalk, closed for building construction/maintenance.
Kenaston Bv to Ruth Cross
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Westbound right turn (yield) lane, closed for street construction/maintenance.
East Gate to West Gate
Expected Duration: 02 Jun 2025 - 30 Sep 2025
Two Hour parking restrictions temporarily lifted to accommodate road construction in the area.
East Gate to West Gate
Expected Duration: 12 Jun 2025 - 13 Jun 2025
Westbound curb lane, closed for film production or special event/festival. Westbound curb lane will be open for morning and afternoon rush hours.
Middle Gate to West Gate
Expected Duration: 04 Jun 2025 - 30 Jun 2025
Temporary Accessible Permit Parking Only location installed in the Westbound curb lane to accommodate for nearby road construction.
Pipeline Rd to Maevista Pl
Expected Duration: 09 Jun 2025 - 07 Aug 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Des Meurons St to Egerton Rd
Expected Duration: 02 Jun 2025 - 01 Aug 2025
Westbound curb lane, closed for loading/unloading.
At McDowell Dr
Expected Duration: 02 Jun 2025 - 01 Aug 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Pandora Av W to Victoria Av W
Expected Duration: 04 Jun 2025 06:00 p.m. - 09 Jun 2025 06:00 p.m.
Northbound curb lane, southbound curb lane, closed for film production or special event/festival.
Victoria Av W to Pandora Av W
Expected Duration: 05 Jun 2025 09:00 a.m. - 08 Jun 2025 11:59 p.m.
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Cherrywood Rd to Glen Ivy Ct
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Grant Av to Mathers Av
Expected Duration: 30 May 2025 - 30 Jun 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance.
Broadway to Portage Av
Expected Duration: 09 Jun 2025 - 27 Jun 2025
Southbound curb lane, closed for sewer work.
Pembina Hw to Hudson St
Expected Duration: 27 May 2025 - 08 Aug 2025
Two-Hour Parking Restrictions temporarily lifted to accommodate residents due to street construction/maintenance in the surrounding area.
Mountbatten Av to Grant Av
Expected Duration: 09 Jun 2025 - 11 Jun 2025
Southbound curb lane, closed for sewer work.
Arlington St to Parr St
Expected Duration: 04 Jun 2025 - 04 Jul 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for water work.
McGregor St to Andrews St
Expected Duration: 17 May 2025 - 16 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
Carriere Av to Caton St
Expected Duration: 16 May 2025 - 13 Jun 2025
All northbound lanes, closed for sewer work. All northbound lanes will be open for morning and afternoon rush hours.
At Willmington Dr
Expected Duration: 25 Apr 2025 - 09 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
Belair Rd to Marshall By
Expected Duration: 06 Jun 2025 - 17 Jun 2025
All westbound lanes, closed for sewer work. Local traffic will be maintained.
Dubuc St to Yardley St
Expected Duration: 22 May 2025 - 20 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
Colony St to Good St
Expected Duration: 09 Apr 2025 - 06 Jun 2025
North side sidewalk, closed for building construction/maintenance.
Donald St to Hargrave St
Expected Duration: 10 Feb 2025 - 18 Jul 2025
Back lane/public lane, closed for building construction/maintenance.
Sherbrook St to Maryland St
Expected Duration: 21 May 2025 - 16 Jun 2025
Westbound curb lane, north side sidewalk, closed for water work. Westbound curb lane will be open for morning and afternoon rush hours.
St Marys Rd to West Fernwood Av
Expected Duration: 20 May 2025 - 13 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Roch St to Brazier St
Expected Duration: 11 Jun 2025 - 18 Jun 2025
Westbound curb lane, closed for landscaping/tree maintenance. Westbound curb lane will be open for afternoon rush hour.
Moorgate St to Vavasour Av
Expected Duration: 13 May 2025 - 09 Jun 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
River Av to Roslyn Rd
Expected Duration: 16 Jun 2025 - 11 Jul 2025
No access to/from Roslyn Rd.
Hamilton Av to Ness Av
Expected Duration: 19 Jun 2025 - 19 Jun 2025
Southbound curb lane, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Lumsden Av to Risbey Cr
Expected Duration: 19 Jun 2025 - 19 Jun 2025
Northbound curb lane, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
Lumsden Av to Risbey Cr
Expected Duration: 21 May 2025 - 16 Jun 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Saskatchewan Av to Lumsden Av
Expected Duration: 19 Jun 2025 - 19 Jun 2025
Southbound curb lane, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Church Av to Inkster Bv
Expected Duration: 23 May 2025 - 20 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
Einarson Av to Portage Av
Expected Duration: 15 Apr 2025 - 10 Jul 2025
West side sidewalk, closed for street construction/maintenance.
Lafrance Ln to Sage Creek Bv
Expected Duration: 11 Jun 2024 - 30 Nov 2024
East side sidewalk, closed for building construction/maintenance.
Salter St to Andrews St
Expected Duration: 27 Feb 2025 - 13 Jun 2025
Westbound curb lane, closed for sewer work.
Aikins St to Charles St
Expected Duration: 07 May 2025 - 09 Jun 2025
Eastbound curb lane, closed for water work.
Artillery St to Sinclair St
Expected Duration: 07 May 2025 - 09 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Alexander Av to Logan Av
Expected Duration: 11 Jun 2025 - 25 Jun 2025
Southbound curb lane, closed for water work.
Buckle Dr to Malone St
Expected Duration: 19 May 2025 - 20 Jun 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
At Donwood Dr
Expected Duration: 26 May 2025 - 06 Jul 2025
Westbound curb lane, closed for street construction/maintenance.
Academy Rd to Kingsway
Expected Duration: 06 May 2025 - 16 Jun 2025
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work.
Grant Av to Mathers Av
Expected Duration: 05 May 2025 - 09 Jun 2025
Back lane/public lane, closed for sewer work.
Cumberland Av to Qu'Appelle Av
Expected Duration: 12 May 2025 - 13 Jun 2025
Back lane/public lane, closed for street construction/maintenance.
Ellice Av to Graham Av
Expected Duration: 13 Jun 2025 - 14 Jun 2025
Southbound median lane, southbound curb lane, closed for film production or special event/festival.
Ellice Av to Portage Av
Expected Duration: 07 Sep 2024 - 05 Sep 2025
Southbound median lane, east side sidewalk, closed for building construction/maintenance. Southbound median lane will be open for morning and afternoon rush hours.
Ellice Av to Portage Av
Expected Duration: 04 Jun 2025 09:00 a.m. - 10 Jun 2025 03:00 p.m.
Southbound median lane, east side sidewalk, closed for electrical/lighting/signals work. Southbound median lane will be open for morning rush hour.
Graham Av to St Mary Av
Expected Duration: 09 Jul 2018 - 01 Sep 2025
Back lane/public lane, west side sidewalk, closed for building construction/maintenance.
Graham Av to St Mary Av
Expected Duration: 18 Mar 2025 - 31 Oct 2025
Patio installed on the east sidewalk; pedestrian access remains open.
Portage Av to Graham Av
Expected Duration: 08 Jun 2025 - 09 Jun 2025
Southbound curb lane, southbound median lane, closed for film production or special event/festival.
Beatrice St to Glenwood Cr
Expected Duration: 25 Apr 2025 - 27 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
Corydon Av to Kenaston Bv
Expected Duration: 02 Jun 2025 - 20 Jun 2025
Southbound curb lane, closed for sewer work.
End to Braemar Av
Expected Duration: 05 May 2025 - 13 Jun 2025
All lanes and south side sidewalk, closed for street construction/maintenance.
Aikins St to Main St
Expected Duration: 08 May 2025 - 06 Jun 2025
Eastbound curb lane, closed for building construction/maintenance.
Airlies St to Sinclair St
Expected Duration: 12 May 2025 - 30 May 2025
All lanes will be closed intermittently for street landscaping/maintenance between the posted dates. Local traffic will be maintained.
McKenzie St to Copp St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
McGregor St to Andrews St
Expected Duration: 16 May 2025 - 30 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Jacob's Creek Rd to Bison Dr
Expected Duration: 28 Feb 2024 - 30 Jun 2025
Northbound curb lane, closed for building construction/maintenance.
Park East Drive to Jacob's Creek Rd
Expected Duration: 09 Jun 2025 - 21 Jun 2025
Northbound curb lane, closed for building construction/maintenance.
Ellice Av to Sargent Av
Expected Duration: 16 May 2025 - 23 Jun 2025
Northbound curb lane, closed for water work.
Sargent Av to Wellington Av
Expected Duration: 11 Jun 2025 - 16 Jun 2025
Northbound curb lane, closed for street construction/maintenance.
Saskatchewan Av to King Edward St E
Expected Duration: 10 Jun 2025 - 10 Jun 2025
Northbound middle lane, closed for street construction/maintenance. Northbound middle lane will be open for morning and afternoon rush hours.
Gaylene Pl to Pembina Hw
Expected Duration: 12 May 2025 - 21 Nov 2025
All lanes closed for street construction/maintenance. One lane in each direction to remain open at all times.
Markham Rd to Lakeshore Rd
Expected Duration: 09 Jun 2025 - 05 Sep 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Pembina Hw to University Cr
Expected Duration: 12 Jun 2025 - 12 Jun 2025
Road will be open, but permit allows for Bomber team to control ingress & egress. All repurposing plans made in coordination with Public Works Traffic Services.
Research Wy to University Cr
Expected Duration: 15 Jun 2025 - 15 Jun 2025 03:00 p.m.
No cars, just cardio. All lanes closed for the Manitoba Marathon.
Roch St to Rothesay St
Expected Duration: 28 Apr 2025 - 09 Jun 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for sewer work.
Daly St S to Montgomery Av
Expected Duration: 26 May 2025 - 04 Jul 2025
All eastbound lanes, south side sidewalk, closed for street construction/maintenance.
Eccles St to Hay St
Expected Duration: 08 Jun 2025 - 09 Jun 2025
Westbound curb lane, closed for film production or special event/festival.
Hudson St to Pembina Hw
Expected Duration: 06 Jun 2025 - 12 Jun 2025
Eastbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Dayton Dr to Manring Cv
Expected Duration: 14 May 2025 - 09 Jun 2025
Westbound curb lane, closed for street construction/maintenance.
Beatrice St to Henderson Hw
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Eastbound curb lane, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Jessie Av to Corydon Av
Expected Duration: 20 Jun 2025 - 20 Jun 2025
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Lorette Av to Garwood Av
Expected Duration: 06 Jun 2025 - 27 Jun 2025
Southbound curb lane, closed for sewer work.
Sinclair St to Artillery St
Expected Duration: 05 Jun 2025 - 11 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
Ness Av to Silver Av
Expected Duration: 10 May 2025 - 09 Jun 2025
Back lane/public lane, closed for sewer work.
Memorial Bv to St Mary Av
Expected Duration: 11 Nov 2023 - 13 Jun 2025
Complete closure of all southbound lanes, complete closure of all northbound lanes, west side sidewalk, closed for street construction/maintenance.
Brazier St to Roch St
Expected Duration: 10 Jun 2025 - 07 Jul 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
London St to Besant St
Expected Duration: 28 May 2025 - 18 Jun 2025
All eastbound lanes, south side sidewalk, closed for street construction/maintenance.
London St to Grey St
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Eastbound curb lane, north side sidewalk, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Bruce Av to Ness Av
Expected Duration: 07 May 2025 - 09 Jun 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance.
Oakland Av to Mark Pearce Av
Expected Duration: 30 May 2025 - 14 Jul 2025
Northbound curb lane, closed for street construction/maintenance.
Daly St N to Hugo St N
Expected Duration: 12 Apr 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Edgeland Bv to Tuxedo Av
Expected Duration: 15 Nov 2024 - 30 Jun 2025
North side sidewalk, closed for building construction/maintenance.
Lanark St to Angelo Grande Bocce Wy
Expected Duration: 25 Apr 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Niagara St to Queenston St
Expected Duration: 20 Feb 2025 - 21 Mar 2025
North side sidewalk, closed for building construction/maintenance.
Wilton St to Guelph St
Expected Duration: 03 Jun 2025 - 13 Jun 2025
Eastbound curb lane, closed for water work.
Wilton St to Guelph St
Expected Duration: 17 Jan 2025 - 06 Jun 2025
South side sidewalk, closed for building construction/maintenance.
Beaverhill Bv to End
Expected Duration: 12 May 2025 - 06 Jun 2025
All lanes will be closed intermittently for street construction/maintenance between the posted dates. Local traffic will be maintained.
South Dr to Stretford Rd
Expected Duration: 15 May 2025 - 16 Jun 2025
Eastbound curb lane, closed for street construction/maintenance.
Lyndale Dr to St Marys Rd
Expected Duration: 20 May 2025 - 31 Oct 2025
All eastbound lanes, all westbound lanes, north side sidewalk, south side sidewalk, closed for street construction/maintenance.
Carlton St to Hargrave St
Expected Duration: 12 May 2025 - 17 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Edmonton St to Carlton St
Expected Duration: 14 May 2025 - 09 Jun 2025
Eastbound curb lane, closed for sewer work.
Hargrave St to Donald St
Expected Duration: 12 May 2025 - 13 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Sinclair St to End
Expected Duration: 12 May 2025 - 30 May 2025
All lanes will be closed intermittently for street landscaping/maintenance between the posted dates. Local traffic will be maintained.
McMillan Av to Corydon Av
Expected Duration: 05 Jun 2025 - 13 Jun 2025
Southbound curb lane, closed for landscaping/tree maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Pembina Hw to Snow St
Expected Duration: 12 Jun 2025 - 12 Jun 2025
Eastbound curb lane, closed for film production or special event/festival.
Van Bellegham Av to Plinguet St
Expected Duration: 31 Mar 2025 - 04 Jul 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
Ravelston Av W to Pandora Av E
Expected Duration: 12 May 2025 - 31 Jul 2025
Southbound curb lane, southbound median lane, northbound left turn storage lane, west side sidewalk, closed for street construction/maintenance.
Thom Av E to Dowling Av W
Expected Duration: 07 Jun 2025 - 04 Jul 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for water work.
At Cliffwood Dr
Expected Duration: 04 Jun 2025 - 09 Jun 2025
All lanes will be closed intermittently for tree maintenance between the posted dates. Local traffic will be maintained, and all lanes will be open during morning and afternoon rush hours.
Elizabeth Rd to Dugas St
Expected Duration: 15 May 2025 - 16 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
Sun Valley Dr to McIvor Av
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Southbound shoulder lane, closed for gas work. Southbound shoulder lane will be open for morning and afternoon rush hours.
Brazier St to Lacy St
Expected Duration: 12 May 2025 - 01 Aug 2025
All lanes and south side sidewalk, closed for street construction/maintenance. One lane to remain open for local access.
At Foxdale Av
Expected Duration: 25 May 2025 - 25 Jun 2025
Eastbound curb lane, closed for water work.
Carriere Av to Guay Av
Expected Duration: 16 Jun 2025 - 16 Jun 2025
Southbound curb lane, closed for film production or special event/festival. Southbound curb lane will be open for morning rush hour.
Horace St to Marion St
Expected Duration: 11 Jun 2025 - 11 Jun 2025
All northbound lanes, closed for building construction/maintenance. All northbound lanes will be open for afternoon rush hour.
Horace St to Marion St
Expected Duration: 16 Apr 2025 - 16 Jun 2025
East side sidewalk, closed for building construction/maintenance.
Horace St to Marion St
Expected Duration: 20 May 2025 - 20 Jun 2025
Northbound curb lane, closed for street construction/maintenance.
Provencher Bv to De La Cathedrale Av
Expected Duration: 22 May 2025 - 20 Jun 2025
Southbound curb lane, closed for water work.
Myles Robinson Wy to Island Lakes Dr
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for street construction/maintenance.
Portage Av to Westminster Av
Expected Duration: 15 May 2025 - 19 Jun 2025
All northbound lanes, closed for sewer work.
Wolever Av to Westminster Av
Expected Duration: 29 May 2025 - 18 Jun 2025
Only right-turns permitted from Dominion St onto Portage Ave. West side crosswalk and east side crosswalk closed. Only one crosswalk to be closed at a time.
Wolseley Av to Westminster Av
Expected Duration: 14 Jun 2025 - 14 Jun 2025
All northbound lanes, all southbound lanes, closed for block party.
Ellice Av to Portage Av
Expected Duration: 14 Nov 2024 - 24 Feb 2025
Back lane/public lane, closed for loading/unloading.
Notre Dame Av to Cumberland Av
Expected Duration: 27 May 2025 - 15 Jun 2025
Southbound median lane, southbound curb lane, west side sidewalk, closed for water work. Southbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Graham Av
Expected Duration: 07 Jun 2025 - 07 Jun 2025
Southbound curb lane, closed for film production or special event/festival. Southbound curb lane will be open for morning rush hour.
St Mary Av to York Av
Expected Duration: 10 Oct 2024 - 01 May 2026
Southbound median lane, south side sidewalk, closed for building construction/maintenance.
York Av to Broadway
Expected Duration: 10 Jan 2025 - 10 Jan 2025
Southbound median lane, southbound painted bike lane, west side sidewalk, closed for building construction/maintenance. Southbound median lane will be open for morning and afternoon rush hours.
Roch St to Henderson Hw
Expected Duration: 09 Jun 2025 - 10 Jun 2025
All lanes will be closed intermittently for tree maintenance between the posted dates. Local traffic will be maintained, and all lanes will be open during morning and afternoon rush hours.
Guelph St to Wilton St
Expected Duration: 13 Jun 2025 - 13 Jun 2025
All eastbound lanes, all westbound lanes, closed for block party.
At Portage Av
Expected Duration: 15 Apr 2025 - 15 Apr 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Falcon Ridge Dr to McGillivray Bv
Expected Duration: 10 Jun 2025 - 18 Jun 2025
Northbound curb lane, eastbound right turn (yield) lane, closed for communications work. Northbound curb lane will be open for morning and afternoon rush hours. Eastbound right turn (yield) lane will be open for morning and afternoon rush hours.
Waterford Green Cmn to Highwater Pa
Expected Duration: 28 May 2025 - 13 Jun 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
At Agate By
Expected Duration: 21 May 2025 - 21 Jun 2025
All southbound lanes, northbound median lane, west side sidewalk, closed for water work.
Notre Dame Av to Orange St
Expected Duration: 16 May 2025 - 09 Jun 2025
Westbound curb lane, eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
At Houde Dr
Expected Duration: 07 May 2025 - 09 Jun 2025
Back lane/public lane, closed for sewer work.
Hugo St N to Arbuthnot St
Expected Duration: 06 Jun 2025 - 27 Jun 2025
Westbound curb lane, closed for sewer work.
Salter St to Powers St
Expected Duration: 13 May 2025 - 09 Jun 2025
Westbound curb lane, north side sidewalk, closed for water work. Westbound curb lane will be open for morning and afternoon rush hours.
Dawson Rd N to Panet Rd
Expected Duration: 05 Dec 2024 - 05 Dec 2024
All eastbound lanes, all westbound lanes, closed for water work. All eastbound lanes will be open for morning and afternoon rush hours. All westbound lanes will be open for morning and afternoon rush hours.
Plessis Rd to Ravenhurst St
Expected Duration: 20 May 2025 - 04 Jul 2025
All westbound lanes, closed for street construction/maintenance. Eastbound width restriction: 2.6m
Thibault St to Langevin St
Expected Duration: 16 Jun 2025 - 16 Jun 2025
All eastbound lanes, all westbound lanes, closed for film production or special event/festival. All eastbound lanes will be open for morning rush hour. All westbound lanes will be open for morning rush hour.
Jim Smith Dr to Taunus Dr
Expected Duration: 09 Jun 2025 - 21 Jul 2025
Westbound curb lane, closed for street construction/maintenance.
Fermor Av to St Vital Bridge
Expected Duration: 09 May 2025 - 27 Jun 2025
Northbound curb lane, northbound median lane, southbound curb lane, southbound median lane, southbound left turn storage lane, southbound left turn storage lane 2, closed for street construction/maintenance. At least one northbound lane and one southbound lane to remain open at all times. Mon, June 16 - Fri, June 20: East side multi-use path closed. Follow detour.
Dunkirk Dr to Kingston Rw
Expected Duration: 09 Jun 2025 - 20 Jun 2025
Northbound curb lane, closed for street construction/maintenance.
Cornish Av to Middle Gate
Expected Duration: 02 Jun 2025 - 30 Sep 2025
Two Hour parking restrictions temporarily lifted to accommodate road construction in the area.
Empress St to Empress St E
Expected Duration: 12 May 2025 - 13 May 2025
Eastbound curb lane, closed for water work.
Empress St to Empress St E
Expected Duration: 14 May 2025 - 16 May 2025
Eastbound middle lane, eastbound painted bike lane, north side sidewalk, closed for sewer work.
Empress St to Empress St E
Expected Duration: 17 Mar 2025 - 17 Oct 2025
Eastbound painted bike lane, north side sidewalk, closed for building construction/maintenance.
Poseidon By to Cambridge St
Expected Duration: 09 Jun 2025 - 29 Aug 2025
Eastbound curb lane, closed for sewer work.
Blenheim Av to Stranmillis Av
Expected Duration: 18 Feb 2025 - 24 Feb 2025
Northbound curb lane, closed for loading/unloading. Northbound curb lane will be open for morning and afternoon rush hours.
Charter Dr to Oak Point Hw
Expected Duration: 20 May 2025 - 27 Jun 2025
Southbound median lane, closed for electrical/lighting/signals work. Southbound median lane will be open for morning and afternoon rush hours.
Elmhurst Rd to Haney St
Expected Duration: 12 May 2025 - 24 Jun 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for street construction/maintenance.
Ellen St to Adelaide St
Expected Duration: 15 May 2025 - 09 Jun 2025
Westbound curb lane, closed for gas work.
Isabel St to Ellen St
Expected Duration: 11 Jun 2025 - 25 Jun 2025
Eastbound curb lane, closed for water work.
Kate St to Isabel St
Expected Duration: 11 Jun 2025 - 25 Jun 2025
Westbound curb lane, closed for water work.
Lily St to Bertha St
Expected Duration: 20 Jun 2025 10:00 a.m. - 20 Jun 2025 11:59 p.m.
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for film production or special event/festival.
Cecil St to Worth St
Expected Duration: 20 May 2025 - 06 Jun 2025
Westbound curb lane, closed for sewer work.
King Edward St to Oddy St
Expected Duration: 11 May 2025 - 13 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
Hansford Rd to De Bourmont Av
Expected Duration: 26 May 2025 - 07 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Agnes St to Maryland St
Expected Duration: 04 Jun 2025 - 13 Jun 2025
Eastbound curb lane, closed for street construction/maintenance.
Hargrave St to Donald St
Expected Duration: 02 Jun 2025 - 13 Jun 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Eldridge Av to Beauchemin Av
Expected Duration: 09 Jun 2025 - 09 Jun 2025
Northbound curb lane, southbound curb lane, closed for sewer work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Ellice Av to St Matthews Av
Expected Duration: 18 May 2025 - 16 Jun 2025
Southbound curb lane, west side sidewalk, closed for water work. Southbound curb lane will be open for morning and afternoon rush hours.
McGregor St to Powers St
Expected Duration: 19 May 2025 - 13 Jun 2025
Westbound curb lane, closed for sewer work. Westbound curb lane will be open for morning rush hour.
Ellice Av to St Matthews Av
Expected Duration: 15 May 2025 - 30 Jun 2025
Southbound curb lane, southbound median lane, east side sidewalk, closed for film production or special event/festival.
Sargent Av to Ellice Av
Expected Duration: 26 May 2025 - 23 Jun 2025
Southbound median lane, southbound curb lane, closed for communications work. Southbound median lane will be open for morning and afternoon rush hours.
St Matthews Av to Wolever Av
Expected Duration: 02 Jun 2025 - 13 Jun 2025
Southbound median lane, east side sidewalk, closed for street construction/maintenance. Southbound median lane will be open for morning and afternoon rush hours.
Traverse Av to Kenny St
Expected Duration: 16 Jun 2025 - 20 Jun 2025
Back lane/public lane, closed for electrical/lighting/signals work. Back lane/Public lane will be open for morning and afternoon rush hours.
Oakfield Pl to Roblin Bv
Expected Duration: 29 May 2025 - 30 Jun 2025
Westbound curb lane, closed for street construction/maintenance.
Des Meurons St to St Marys Rd
Expected Duration: 16 Jun 2025 - 16 Jun 2025
Westbound curb lane, closed for film production or special event/festival. Westbound curb lane will be open for morning rush hour.
At Lismer Cr
Expected Duration: 09 Jun 2025 - 07 Jul 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Vanderbilt Dr to Scurfield Bv
Expected Duration: 11 Jun 2025 - 07 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Marymount Pl to Markham Rd
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Eastbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Broadway to Assiniboine Av
Expected Duration: 12 Nov 2024 - 01 Dec 2025
East side sidewalk, closed for building construction/maintenance.
York Av to St Mary Av
Expected Duration: 02 Apr 2025 - 31 Oct 2025
Patio installed on the Northbound curb lane and east sidewalk; pedestrian access remains open.
Pentland St to Henderson Hw
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Eastbound curb lane, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Pentland St to Summerfield Wy
Expected Duration: 12 May 2025 - 30 Jun 2025
At Dale Bv
Expected Duration: 09 May 2025 - 09 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
Rothesay St to End
Expected Duration: 13 Jun 2025 - 13 Jun 2025
Eastbound curb lane, westbound curb lane, closed for electrical/lighting/signals work. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
At Fairlane Av
Expected Duration: 26 May 2025 - 25 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Ellice Av to Portage Av
Expected Duration: 09 Jun 2025 - 10 Jun 2025
All northbound lanes, northbound curb lane, east side sidewalk, closed for building construction/maintenance.
Ellice Av to Portage Av
Expected Duration: 09 May 2025 - 13 May 2025
All lanes closed for building construction/maintenance. All lanes open for peak hours.
Furby Pl to Portage Av
Expected Duration: 02 Dec 2024 - 02 Feb 2026
Southbound curb lane, west side sidewalk, closed for building construction/maintenance.
Sargent Av to Ellice Av
Expected Duration: 02 Jun 2025 - 08 Aug 2025
Two-hour parking restriction temporarily lifted to accommodate for road construction in the area.
Dee St to Midmar Av
Expected Duration: 10 May 2025 - 09 Jun 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
Grundy Av to Yarwood Av
Expected Duration: 17 May 2025 - 09 Jun 2025
All northbound lanes, all southbound lanes, closed for sewer work.
St Matthews Av to Ellice Av
Expected Duration: 30 May 2025 - 23 Jun 2025
All southbound lanes, all northbound lanes, closed for water work.
At Mount Royal Rd
Expected Duration: 15 May 2025 - 16 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
Broadway to Assiniboine Av
Expected Duration: 04 Jun 2025 - 13 Jun 2025
Southbound median lane, southbound protected bike lane, northbound protected bike lane, closed for electrical/lighting/signals work.
Ellice Av to Portage Av
Expected Duration: 05 Jun 2025 - 11 Jun 2025
Southbound curb lane, closed for street construction/maintenance.
Graham Av to St Mary Av
Expected Duration: 11 Jun 2025 - 11 Jun 2025
Southbound curb lane, southbound middle lane, west side sidewalk, closed for building construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours. Southbound middle lane will be open for morning and afternoon rush hours.
Graham Av to St Mary Av
Expected Duration: 10 Jun 2025 - 10 Jun 2025
Southbound curb lane, southbound middle lane, west side sidewalk, closed for building construction/maintenance. All lanes open for peak hours.
St Mary Av to York Av
Expected Duration: 27 Mar 2025 - 28 Mar 2025
Southbound curb lane, west side sidewalk, closed for building construction/maintenance.
Munroe Av to Springfield Rd
Expected Duration: 15 May 2025 - 27 Jun 2025
Northbound curb lane, southbound curb lane, closed for building construction/maintenance. Only one lane to be closed at a time and yield to oncoming traffic signs/flaggers to be used. All lanes to be open for peak hours.
Chancellor Dr to End
Expected Duration: 09 Jul 2024 - 30 Nov 2025
Southbound curb lane, closed for building construction/maintenance.
At Cavalier Dr
Expected Duration: 26 May 2025 - 04 Jul 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Serenity Cv to Malcana St
Expected Duration: 06 May 2025 - 12 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
End to Osborne St
Expected Duration: 23 May 2025 - 19 Jun 2025
Westbound curb lane, closed for street construction/maintenance.
St Mary Av to Portage Av
Expected Duration: 14 May 2024 - 07 Jul 2025
Northbound curb lane, closed for building construction/maintenance.
St Mary Av to Portage Av
Expected Duration: 11 Jul 2023 - 07 Jul 2025
East side sidewalk, closed for building construction/maintenance.
Brazier St to Stadacona St
Expected Duration: 12 May 2025 - 01 Aug 2025
All eastbound lanes, all westbound lanes, north side sidewalk, south side sidewalk, closed for street construction/maintenance. At least one sidewalk to remain open for access.
At Wolever Av
Expected Duration: 01 May 2025 - 03 May 2025
Springfield Rd to Sutton Av
Expected Duration: 11 Jun 2025 - 18 Jun 2025
Southbound curb lane, closed for landscaping/tree maintenance. Southbound curb lane will be open for afternoon rush hour.
Smith St to Garry St
Expected Duration: 11 Jun 2025 - 11 Jun 2025
All eastbound lanes, all westbound lanes, north side sidewalk, south side sidewalk, closed for street construction/maintenance. Only one lane and sidewalk to be closed at a time.
Waverley St to Oxford St
Expected Duration: 05 Jun 2025 - 13 Jun 2025
Westbound curb lane, closed for landscaping/tree maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Lagimodiere Bv to Silver Fields Ln
Expected Duration: 10 Jun 2025 - 07 Jul 2025
Eastbound curb lane, westbound curb lane, westbound middle lane, south side sidewalk, closed for communications work. All lanes to be open for peak hours. Only one lane in each direction to be closed at a time.
Skowron Cr to Plessis Rd
Expected Duration: 10 Jun 2025 - 17 Jun 2025
Eastbound shoulder lane, closed for communications work. Eastbound shoulder lane will be open for morning and afternoon rush hours.
Skowron Cr to Plessis Rd
Expected Duration: 07 Jun 2025 - 08 Jun 2025
Westbound curb lane, eastbound curb lane, closed for street construction/maintenance. All lanes will be open for morning and afternoon rush hours. Traffic in both directions to be maintained and managed by flagpersons.
At Louelda St
Expected Duration: 12 May 2025 - 01 Aug 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. One lane to remain open for local access.
Glenthorne Cr to St Marys Rd
Expected Duration: 12 Jun 2025 - 03 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
St Marys Rd to Glenthorne Cr
Expected Duration: 07 May 2025 - 09 Jun 2025
Westbound curb lane, south side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Wolever Av to Portage Av
Expected Duration: 03 Jun 2025 - 11 Jun 2025
Right-turns only from Greenwood Pl to Portage Ave.
At Witham Rd
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Eastbound curb lane, north side sidewalk, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Lilac St to Wentworth St
Expected Duration: 23 May 2025 - 23 May 2025
Eastbound curb lane, south side sidewalk, closed for landscaping/tree maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Wentworth St to Stafford St
Expected Duration: 12 Mar 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Rover Av to Rex Av
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Westbound curb lane, north side sidewalk, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Roch St to End
Expected Duration: 12 May 2025 - 30 May 2025
All lanes closed intermittently for street construction/maintenance between the posted dates. All lanes will be open during morning and afternoon rush hours.
Ness Av to Bruce Av
Expected Duration: 03 Jun 2025 - 23 Jun 2025
All northbound lanes, southbound curb lane, east side sidewalk, closed for water work. Southbound curb lane will be open for morning and afternoon rush hours.
Cumberland Av to Ellice Av
Expected Duration: 12 May 2025 - 13 Jun 2025
Back lane/public lane, closed for street construction/maintenance.
At Raquette St
Expected Duration: 20 May 2025 - 02 Jul 2025
Southbound curb lane, closed for street construction/maintenance.
Roch St to Rothesay St
Expected Duration: 11 Jun 2025 - 18 Jun 2025
Eastbound curb lane, closed for landscaping/tree maintenance. Eastbound curb lane will be open for afternoon rush hour.
Arnold Av to Morley Av
Expected Duration: 02 Dec 2024 - 20 Feb 2026
Southbound curb lane, closed for building construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Harper Av to Winakwa Rd
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Nathaniel St to Wilton St
Expected Duration: 25 Apr 2025 - 04 Jul 2025
Eastbound curb lane, closed for sewer work.
Henderson Hw to Brazier St
Expected Duration: 20 May 2025 - 13 Jun 2025
All eastbound lanes, all westbound lanes, back lane/public lane, south side sidewalk, closed for sewer work.
Henderson Hw to Woodvale St
Expected Duration: 14 May 2025 - 17 Jun 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning rush hour. Local access to be maintained.
Cobourg Av to Noble Av
Expected Duration: 17 Jun 2025 - 17 Jun 2025
Southbound curb lane, west side sidewalk, closed for building construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Greene Av to Roberta Av
Expected Duration: 11 Jun 2025 - 07 Jul 2025
Northbound curb lane, southbound curb lane, east side sidewalk, closed for water work.
Greene Av to Roberta Av
Expected Duration: 02 May 2025 - 02 May 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Helmsdale Av to Kimberly Av
Expected Duration: 12 Jun 2025 - 07 Jul 2025
Southbound median lane, west side sidewalk, closed for sewer work.
McLeod Av to Devon Av
Expected Duration: 10 Jun 2025 - 30 Jun 2025
Northbound curb lane, southbound curb lane, northbound middle lane, east side sidewalk, west side sidewalk, closed for gas work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Kimberly Av to End
Expected Duration: 04 Jun 2025 - 04 Jul 2025
Northbound curb lane, closed for street construction/maintenance.
Sutherland Av to Point Douglas Av
Expected Duration: 26 May 2025 - 09 Jun 2025
All southbound lanes, closed for street construction/maintenance.
Dubuc St to Eugenie St
Expected Duration: 30 May 2025 - 17 Jun 2025
Southbound curb lane, closed for loading/unloading.
Sargent Av to Ellice Av
Expected Duration: 04 Jun 2025 - 08 Jun 2025
Southbound curb lane, west side sidewalk, closed for gas work. Southbound curb lane will be open for morning and afternoon rush hours.
Leahcrest Cr to Scarfe St
Expected Duration: 12 May 2025 - 30 Jun 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for street construction/maintenance. All westbound lanes will be open for morning and afternoon rush hours.
At Island Shore Bv
Expected Duration: 26 May 2025 - 31 Oct 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Dunlop Av to Church Av
Expected Duration: 06 May 2025 - 06 Jun 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
St Annes Rd to Des Meurons St
Expected Duration: 28 May 2025 - 27 Jun 2025
Eastbound curb lane, south side sidewalk, closed for water work.
Ellice Av to Sargent Av
Expected Duration: 14 May 2025 - 14 Jul 2025
Southbound curb lane, closed for loading/unloading.
Lansdowne Av to Aikins St
Expected Duration: 13 May 2025 - 01 Aug 2025
All eastbound lanes, south sidewalk closed for street construction/maintenance. At least one eastbound lane and sidewalk will be open at all times.
Main St to Lansdowne Av
Expected Duration: 12 May 2025 - 29 Aug 2025
All westbound lanes, north side sidewalk, closed for street construction/maintenance. At least one westbound lane will be open at all times. Left-turns restricted from Westbound Inkster Blvd to Southbound McPhillips St starting Monday, June 2.
Milner St to Bunting St
Expected Duration: 09 Jun 2025 - 09 Jun 2025
Eastbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Salter St to Aikins St
Expected Duration: 06 Jun 2025 - 11 Jul 2025
Eastbound curb lane, south side sidewalk, closed for water work.
Sinclair St to Main St
Expected Duration: 12 May 2025 - 30 Jun 2025
All eastbound lanes, south sidewalk closed for street construction/maintenance. At least one eastbound lane and sidewalk will be open at all times.
Centre St to Park West Dr
Expected Duration: 28 Jan 2025 - 30 Sep 2025
North side sidewalk, closed for building construction/maintenance.
Centre St to Park West Dr
Expected Duration: 09 Nov 2022 - 30 Nov 2024
North side sidewalk, closed for building construction/maintenance.
King St to Main St
Expected Duration: 04 Jan 2022 - 08 Jan 2026
Eastbound median lane, closed for loading/unloading.
Cail By to Ritchie St
Expected Duration: 28 May 2025 - 13 Jun 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Mandalay Dr to Cannes Cr
Expected Duration: 28 May 2025 - 20 Jun 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Sheppard St to Marbury Rd
Expected Duration: 05 Jun 2025 - 30 Jun 2025
All lanes closed for electrical/lighting/signals work. Only one lane in each direction will be closed at a time. All lanes will be open for morning and afternoon rush hours.
Watson St to McPhillips St
Expected Duration: 28 May 2025 - 13 Jun 2025
Eastbound curb lane closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Hugo St N to Cockburn St N
Expected Duration: 07 Jun 2025 - 07 Jun 2025
All eastbound lanes, all westbound lanes, closed for block party.
Rose Hill Wy to Forest Cove Dr
Expected Duration: 26 May 2025 - 26 Jun 2025
Back lane/public lane, closed for sewer work.
Pembina Hw SB to Jubilee Av EB to Riverside Dr
Expected Duration: 30 May 2025 09:00 a.m. - 30 May 2025 12:00 p.m.
Eastbound curb lane, south side sidewalk, closed for landscaping/tree maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
At Betournay St
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Pandora Av E to Ravelston Av E
Expected Duration: 19 May 2025 - 20 Jun 2025
All northbound lanes, all southbound lanes, north side sidewalk, south side sidewalk, closed for street construction/maintenance. Only one sidewalk to be closed at a time.
Nairn Av to Thomas Av
Expected Duration: 15 Jun 2025 02:00 p.m. - 15 Jun 2025 11:59 p.m.
All northbound lanes, all southbound lanes, closed for film production or special event/festival.
Nairn Av to Thomas Av
Expected Duration: 08 Jun 2025 02:00 p.m. - 08 Jun 2025 11:59 p.m.
All northbound lanes, all southbound lanes, closed for film production or special event/festival.
Elgin Av W to William Av W
Expected Duration: 26 May 2025 09:00 a.m. - 16 Jun 2025 03:00 p.m.
Southbound curb lane, closed for gas work.
Inkster Garden Dr to Tyndall Av
Expected Duration: 28 May 2025 - 11 Jun 2025
Southbound curb lane, southbound painted bike lane, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Manitoba Av to Tyndall Av
Expected Duration: 07 May 2025 - 09 Jun 2025
Northbound curb lane, east side sidewalk, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
Ross Av W to Alexander Av
Expected Duration: 23 May 2025 - 30 Jun 2025
Northbound curb lane, east side sidewalk, closed for water work.
Ken Wong Bay to Country Meadow Bv
Expected Duration: 06 May 2025 - 19 Jun 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Grant Av to Carpathia Rd
Expected Duration: 05 Jun 2025 - 12 Jun 2025
Northbound curb lane, east side sidewalk, closed for sewer work.
Lowson Cr to Rothwell Rd
Expected Duration: 16 Jun 2025 - 18 Jun 2025
Mon, June 16 19:00 - Tues, June 17 06:00: All southbound lanes closed for street construction/maintenance at the rail line crossing. Use Sterling Lyon to Waverley St detour. Tues, June 17 19:00 - Wed, June 18 06:00: All northbound lanes closed for street construction/maintenance at the rail line crossing. Use McGillivray to Waverley St detour.
At Assiniboine Av
Expected Duration: 14 Apr 2025 - 14 Nov 2025
East side sidewalk, closed for building construction/maintenance.
Graham Av to St Mary Av
Expected Duration: 17 May 2025 - 23 Jun 2025
Southbound curb lane, closed for sewer work.
Kanata St to Roanoke St
Expected Duration: 19 May 2025 - 20 Jun 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Powers St to McGregor St
Expected Duration: 07 Feb 2025 - 13 Jun 2025
Westbound curb lane, closed for sewer work.
At Brewster By
Expected Duration: 29 May 2025 - 30 Jun 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for water work.
Irving Pl to Hawthorne Av
Expected Duration: 17 Jun 2025 - 17 Jun 2025
Southbound curb lane, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Westwood Dr to Carroll Rd
Expected Duration: 09 Jun 2025 - 25 Jul 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
Kullman St to Molson St
Expected Duration: 12 May 2025 - 01 Aug 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for street construction/maintenance. One lane to remain open for local access.
Kurt Av to Flye Av
Expected Duration: 09 Jun 2025 - 30 Jun 2025
Northbound curb lane, southbound curb lane, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Powell Av to Notre Dame Av
Expected Duration: 12 May 2025 - 16 Jun 2025
Northbound curb lane, closed for sewer work. Northbound curb lane will be open for morning and afternoon rush hours.
Sargent Av to Ellice Av
Expected Duration: 30 May 2025 - 23 Jun 2025
Southbound curb lane, west side sidewalk, closed for gas work. Southbound curb lane will be open for morning and afternoon rush hours.
Bannatyne Av to William Av
Expected Duration: 06 Jun 2025 - 08 Jun 2025
Northbound curb lane, closed for film production or special event/festival.
Bannatyne Av to William Av
Expected Duration: 16 Jun 2025 - 23 Jun 2025
Northbound curb lane, east side sidewalk, closed for film production or special event/festival.
Bannatyne Av to William Av
Expected Duration: 16 Nov 2024 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
Bannatyne Av to William Av
Expected Duration: 16 May 2025 - 16 May 2025
Northbound median lane, west side sidewalk, closed for loading/unloading. Northbound median lane will be open for afternoon rush hour.
William Av to James Av
Expected Duration: 18 Mar 2024 - 16 Jul 2025
West side sidewalk, closed for building construction/maintenance.
Andrews St to Powers St
Expected Duration: 11 Mar 2025 - 13 Jun 2025
Eastbound curb lane, closed for sewer work.
At Cropo By
Expected Duration: 21 May 2025 - 16 Jun 2025
Eastbound curb lane, south side sidewalk, closed for water work.
Pembina Hw to Hillmartin Dr
Expected Duration: 02 Sep 2024 - 28 Nov 2025
North side sidewalk, closed for building construction/maintenance.
Meadowood Dr to Homewood Dr
Expected Duration: 11 Jun 2025 - 30 Jun 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Sunny Morning Rd to Gateway Rd
Expected Duration: 05 Jun 2025 - 07 Jun 2025
Westbound curb lane, eastbound curb lane, closed for sewer work. Westbound curb lane will be open for morning and afternoon rush hours. Eastbound curb lane will be open for morning and afternoon rush hours.
Kimberly Av to Snowdon Av
Expected Duration: 12 May 2025 - 01 Aug 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. One lane to remain open for local access.
Gordon Av to End
Expected Duration: 12 May 2025 - 01 Aug 2025
All lanes closed for street construction/maintenance. One lane to remain open for local access.
Chief Peguis Tl to Springfield Rd
Expected Duration: 28 May 2025 - 02 Jul 2025
Northbound shoulder lane, closed for loading/unloading.
Abinojii Mikanah to McGurran Pl
Expected Duration: 26 May 2025 - 07 Jul 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Abinojii Mikanah to McGurran Pl
Expected Duration: 29 May 2025 - 30 Jun 2025
Northbound curb lane, southbound curb lane, east side sidewalk, closed for communications work. All lanes to be open for rush hours.
Vermillion Rd to Fermor Av
Expected Duration: 20 May 2025 - 20 Jun 2025
Northbound curb lane, east side sidewalk, closed for water work.
Cuthbertson Av to Aldershot Bv
Expected Duration: 16 May 2025 - 03 Jun 2025
All lanes and sidewalks will be closed intermittently for tree maintenance. Only one lane and one sidewalk will be closed at any given time, and all lanes and sidewalks will be open during morning and afternoon rush hours. Local Traffic maintained.
Taylor Av to Mathers Av
Expected Duration: 10 Jun 2025 - 04 Jul 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance.
Notre Dame St to Dumoulin St
Expected Duration: 16 Jun 2025 - 16 Jun 2025
All northbound lanes, all southbound lanes, closed for film production or special event/festival. All northbound lanes will be open for morning rush hour. All southbound lanes will be open for morning rush hour.
Ellice Av to Sargent Av
Expected Duration: 02 Jun 2025 - 08 Aug 2025
Two-hour parking restriction temporarily lifted to accommodate for road construction in the area.
Notre Dame Av to Cumberland Av
Expected Duration: 02 Jun 2025 - 01 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Sara Av to Westminster Av
Expected Duration: 06 Jun 2025 - 08 Jun 2025
All lanes, west side sidewalk, closed intermittently for film production or special event/festival.
At McPhillips St
Expected Duration: 19 May 2025 - 01 Aug 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Main St to Aikins St
Expected Duration: 28 May 2025 - 05 Jun 2025
Westbound curb lane, closed for building construction/maintenance.
Main St to Aikins St
Expected Duration: 02 Apr 2025 - 13 Jun 2025
North side sidewalk, closed for building construction/maintenance.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Brazier St to Henderson Hw
Expected Duration: 06 May 2025 - 09 Jun 2025
Westbound curb lane, closed for gas work. Westbound curb lane will be open for morning and afternoon rush hours.
Jessie Av to Corydon Av
Expected Duration: 21 Jun 2025 - 21 Jun 2025
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Cromwell St to Poulin Pl
Expected Duration: 12 May 2025 - 06 Jun 2025
All lanes will be closed intermittently for street construction/maintenance between the posted dates. Local traffic will be maintained.
Galt Av to Alexander Av
Expected Duration: 09 Jun 2025 - 11 Jun 2025
Northbound curb lane, southbound curb lane, west side sidewalk, closed for sewer work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Golspie St to Raleigh St
Expected Duration: 09 Jun 2025 - 20 Jun 2025
Eastbound curb lane, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Grosvenor Av to Kingsway
Expected Duration: 22 May 2025 - 20 Jun 2025
All northbound lanes, all southbound lanes, closed for sewer work.
Portage Av to Westminster Av
Expected Duration: 07 Jan 2025 - 08 Jan 2025
All southbound lanes, west side sidewalk, closed for building construction/maintenance. All southbound lanes will be open for morning and afternoon rush hours.
Ada St to King Edward St
Expected Duration: 29 May 2025 - 23 Jun 2025
Westbound curb lane, north side sidewalk, closed for water work. Westbound curb lane will be open for morning and afternoon rush hours.
Owena St to Gunnell St
Expected Duration: 03 Jun 2025 - 13 Jun 2025
Eastbound curb lane, closed for electrical/lighting/signals work. Eastbound curb lane will be open for morning and afternoon rush hours.
Yeomans St to McPhillips St
Expected Duration: 13 May 2025 - 09 Jun 2025
Eastbound curb lane, eastbound median lane, south side sidewalk, closed for water work. Only one lane will be closed at a time.
Higgins Av to Stadacona St
Expected Duration: 23 May 2025 - 31 Jul 2025
All northbound lanes, all southbound lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
Cromwell St to Gauvin St
Expected Duration: 08 Jun 2025 - 08 Jun 2025
All northbound lanes, all southbound lanes, closed for film production or special event/festival. All northbound lanes will be open for afternoon rush hour. All southbound lanes will be open for afternoon rush hour.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Regent Av W to Pandora Av W
Expected Duration: 05 Jun 2025 - 08 Jun 2025
Northbound curb lane, closed for film production or special event/festival.
Ness Av to Silver Av
Expected Duration: 11 Jun 2025 - 18 Jun 2025
Southbound curb lane, closed for sewer work. Southbound curb lane will be open for morning and afternoon rush hours.
Assiniboine Av to Forks Market Rd
Expected Duration: 14 Jun 2025 - 15 Jun 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance.
Bannatyne Av to Market Av
Expected Duration: 14 Jun 2025 - 15 Jun 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Carruthers Av to Lansdowne Av
Expected Duration: 28 Mar 2025 - 09 Oct 2026
West side sidewalk, closed for building construction/maintenance.
Leila Av to Red River Bv
Expected Duration: 23 May 2025 - 20 Jun 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Logan Av to Alexander Av
Expected Duration: 26 May 2025 - 23 Jun 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
McDermot Av to Bannatyne Av
Expected Duration: 11 Jun 2025 - 11 Jun 2025
East side sidewalk, closed for film production or special event/festival.
Portage Av to Lombard Av
Expected Duration: 11 Dec 2024 - 01 Jul 2025
Pedestrians: East side sidewalk, west side sidewalk, closed for street construction/maintenance. Mon, May 26 - Sun, June 8: - Southbound curb lane (First right-turn lane closest to curb) and southbound median lane closed. Northbound curb lane and Northbound median lane closed. Mon, June 9 - Tues, June 10: - Southbound curb lane (First right-turn lane closest to curb) and Northbound curb lane closed. Wed, June 11 - TBD: - Both Southbound middle lanes and one Northbound middle lane (lane directly adjacent to the Northbound Median Lane) closed.
Portage Av to Pioneer Av
Expected Duration: 04 Dec 2024 - 01 Jul 2025
Pedestrians: East side sidewalk, west side sidewalk, closed for street construction/maintenance. Mon, May 26 - Sun, June 8: - Southbound curb lane, southbound median lane closed. Northbound curb lane and northbound median lane closed. Mon, June 9 - Tues, June 10: - Southbound curb lane, Northbound curb lane closed. Wed, June 11 - TBD: - Southbound middle lane (lane adjacent to southbound median lane), Northbound middle lane (lane adjacent to Northbound median lane) closed.
Sutherland Av to Jarvis Av
Expected Duration: 05 May 2025 - 09 Jun 2025
Southbound middle lane, southbound median lane, closed for water work.
Osborne St to Hay St
Expected Duration: 10 Jun 2025 - 25 Jul 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for sewer work.
At Sinclair St
Expected Duration: 06 Jun 2025 02:00 p.m. - 06 Jun 2025 08:00 p.m.
Complete closure of all westbound lanes, closed for film production or special event/festival.
Des Meurons St to Youville St
Expected Duration: 01 Apr 2025 - 05 Sep 2025
South side sidewalk, closed for building construction/maintenance.
Des Meurons St to Youville St
Expected Duration: 11 Jun 2025 - 11 Jun 2025
Eastbound curb lane, closed for building construction/maintenance.
Holden Av to Dupuy Av
Expected Duration: 30 May 2025 - 13 Jun 2025
Westbound curb lane, closed for communications work. Westbound curb lane will be open for morning and afternoon rush hours.
Pembina Hw to University Cr
Expected Duration: 12 Jun 2025 05:30 p.m. - 12 Jun 2025 11:59 p.m.
IG Field Traffic Plan - additional traffic controls in place for special event access, parking, and egress
Masterton Cr to Jefferson Av
Expected Duration: 05 Jun 2025 - 30 Jun 2025
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Clarence Av to Brisbane Av
Expected Duration: 06 Jun 2025 - 17 Jun 2025
All southbound lanes, closed for sewer work.
Logan Av to Austin St
Expected Duration: 01 Jun 2024 - 17 Sep 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance.
Henderson Hw to Brazier St
Expected Duration: 02 Jun 2025 - 30 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
Cumberland Av to Sargent Av
Expected Duration: 19 May 2025 - 16 Jun 2025
Southbound curb lane, southbound painted bike lane, west side sidewalk, closed for water work. Southbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Broadway
Expected Duration: 10 Jul 2023 - 01 Dec 2025
West side sidewalk, closed for building construction/maintenance.
Westminster Av to Dundurn Pl
Expected Duration: 23 May 2025 - 06 Jun 2025
Southbound protected bike lane, east side sidewalk, closed for street construction/maintenance.
Westminster Av to Wolseley Av
Expected Duration: 16 May 2025 - 16 Jun 2025
Southbound median lane, east side sidewalk, closed for water work. Southbound median lane will be open for morning and afternoon rush hours.
Parr St to Copp St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Harkness St to Queen Elizabeth Way
Expected Duration: 11 Jun 2025 - 12 Jun 2025
Eastbound median lane, eastbound middle lane, north side sidewalk, closed for building construction/maintenance. Eastbound middle lane will be open for morning and afternoon rush hours.
Harkness St to Queen Elizabeth Way
Expected Duration: 06 Jun 2025 - 06 Jun 2025
Eastbound median lane, north side sidewalk, closed for loading/unloading.
Harkness St to Queen Elizabeth Way
Expected Duration: 24 May 2025 - 27 Jun 2025
Eastbound middle lane, closed for water work.
Cottonwood Rd to Westmount Dr
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Aikins St to Main St
Expected Duration: 09 May 2025 - 06 Jun 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for sewer work.
Parr St to Copp St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Sinclair St to Arlington St
Expected Duration: 12 May 2025 - 30 May 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Albert St to Main St
Expected Duration: 20 Jun 2025 - 20 Jun 2025
Back lane/public lane, closed for film production or special event/festival.
At Tecumseh St
Expected Duration: 09 Sep 2024 - 30 Jun 2025
North side sidewalk, closed for building construction/maintenance.
St Matthews Av to Ellice Av
Expected Duration: 02 Jun 2025 - 15 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
At Dunkley St
Expected Duration: 14 Nov 2024 - 28 Nov 2024
Westbound shoulder lane, closed for gas work.
Anderson Av to Smithfield Av
Expected Duration: 02 Jun 2025 - 15 Aug 2025
Northbound median lane, all southbound lanes, west side sidewalk, closed for street construction/maintenance.
Mountain Av to Anderson Av
Expected Duration: 29 May 2025 - 27 Jun 2025
Parking restrictions lifted on McGregor Ave to accommodate emergency relief.
Henderson Hw to Rothesay St
Expected Duration: 09 Jun 2025 - 30 Jun 2025
Eastbound curb lane, westbound curb lane, closed for water work.
Church Av to Polson Av
Expected Duration: 12 May 2025 - 13 Jun 2025
Northbound curb lane, southbound curb lane, east side sidewalk, closed for street construction/maintenance. One lane to remain open at all times.
Inkster Bv to Lansdowne Av
Expected Duration: 12 May 2025 - 15 Aug 2025
All lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance. Only one sidewalk to be closed at a time.
Sargent Av to Ellice Av
Expected Duration: 02 Jun 2025 - 07 Aug 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
At River Rd
Expected Duration: 23 Apr 2025 - 09 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
Polson Av to Lansdowne Av
Expected Duration: 15 May 2025 - 29 Aug 2025
Northbound curb lane, southbound curb lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance. Only one sidewalk to be closed at a time.
Templeton Av to Swailes Av
Expected Duration: 28 May 2025 - 30 Jun 2025
Northbound curb lane, southbound curb lane, west side sidewalk, closed for communications work. Northbound curb lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours.
Mission St to Plinguet St
Expected Duration: 22 May 2025 - 09 Jun 2025
Southbound curb lane, closed for sewer work. Southbound curb lane will be open for morning and afternoon rush hours.
At Woodford By
Expected Duration: 05 Jun 2025 - 25 Jul 2025
Eastbound curb lane, westbound curb lane, north side sidewalk, closed for sewer work. Eastbound curb lane will be open for morning and afternoon rush hours.
Woodford BY to Ashworth St
Expected Duration: 25 Apr 2025 - 09 Jun 2025
Eastbound curb lane, closed for sewer work.
Leola St to End
Expected Duration: 12 May 2025 - 31 Jul 2025
All eastbound lanes, all westbound lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
St Mary Av to Portage Av
Expected Duration: 17 Nov 2024 - 16 Nov 2026
Northbound curb lane, northbound middle lane, northbound middle lane 2, east side sidewalk, closed for building construction/maintenance.
Archibald St to Dawson Rd N
Expected Duration: 30 May 2025 - 30 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
Blanchard Av to Cornish Av
Expected Duration: 12 Jun 2025 - 13 Jun 2025
All southbound lanes, all northbound lanes, west side sidewalk, closed for film production or special event/festival. All southbound lanes will be open for morning and afternoon rush hours. All northbound lanes will be open for morning and afternoon rush hours.
Blanchard Av to End
Expected Duration: 04 Jun 2025 - 30 Jun 2025
Temporary Accessible Permit Parking Only location installed in the Southbound curb lane to accommodate for nearby road construction.
Cornish Av to End
Expected Duration: 02 Jun 2025 - 30 Sep 2025
Two Hour parking restrictions temporarily lifted to accommodate road construction in the area.
Wolever Av to Portage Av
Expected Duration: 09 Jun 2025 - 10 Jun 2025
No Left Turns onto Portage Ave.
King Edward St to Pipeline Rd
Expected Duration: 09 Jun 2025 - 31 Oct 2025
Westbound curb lane, closed for street construction/maintenance.
Fisher St to Casey St
Expected Duration: 05 Jun 2025 - 19 Jun 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Bruce Av to Lodge Av
Expected Duration: 03 Jun 2025 - 27 Jun 2025
All southbound lanes, all northbound lanes, west side sidewalk, closed for sewer work.
Strauss Dr to Murray Park Rd
Expected Duration: 26 May 2025 - 30 Jun 2025
Northbound curb lane, east side multi-use path, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Egerton Rd to Youville St
Expected Duration: 07 Jun 2025 - 09 Jun 2025
Westbound curb lane, closed for film production or special event/festival.
Osborne St to Hay St
Expected Duration: 02 Dec 2024 - 20 Feb 2026
All eastbound lanes, south side sidewalk, closed for building construction/maintenance.
Osborne St to Nassau St S
Expected Duration: 09 Jun 2025 - 04 Jul 2025
Westbound curb lane, closed for street construction/maintenance.
Taylor Av to End
Expected Duration: 15 Jun 2025 - 16 Jun 2025
Southbound curb lane, closed for loading/unloading.
Fife St to McPhillips St
Expected Duration: 09 Jun 2025 - 18 Jul 2025
Westbound curb lane, westbound median lane, north side sidewalk, closed for street construction/maintenance. A median cross-over will occur providing one westbound and one eastbound travel lanes.
Main St to Charles St
Expected Duration: 11 Mar 2025 - 11 Mar 2025
North side sidewalk, closed for building construction/maintenance.
Stapleton St to Keenleyside St
Expected Duration: 24 May 2025 - 30 Jun 2025
Back lane/public lane, closed for sewer work.
Jubilee Av to Montague Av
Expected Duration: 26 May 2025 - 16 Jun 2025
Northbound curb lane, southbound curb lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance. Only one sidewalk closed at a time.
Taylor Av to Grant Av
Expected Duration: 13 Jan 2025 - 01 Sep 2025
Southbound curb lane, west side sidewalk, closed for sewer work.
Amherst St to Inglewood St
Expected Duration: 09 Jun 2025 - 20 Jun 2025
Eastbound curb lane, south side sidewalk, closed for communications work. Eastbound curb lane will be open for morning and afternoon rush hours.
Amherst St to Inglewood St
Expected Duration: 10 Jun 2025 - 20 Jun 2025
Eastbound curb lane, closed for communications work. Eastbound curb lane will be open for morning and afternoon rush hours.
Braintree Rd to Moray St
Expected Duration: 02 Jun 2025 - 23 Jun 2025
Westbound curb lane, closed for sewer work. Westbound curb lane will be open for morning and afternoon rush hours.
Rutland St to Inglewood St
Expected Duration: 26 May 2025 - 10 Jun 2025
Eastbound curb lane, south side sidewalk, closed for communications work.
End to Seagrim Rd
Expected Duration: 10 Jun 2025 - 13 Jun 2025
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
St Annes Rd to End
Expected Duration: 26 May 2025 - 08 Jul 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Henderson Hw to Beatrice St
Expected Duration: 06 Jun 2025 - 06 Jun 2025
Westbound curb lane, north side sidewalk, closed for building construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
At Antrim Rd
Expected Duration: 12 May 2025 - 01 Aug 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. One lane to remain open for local access.
Wicklow St to Pembina Hw
Expected Duration: 12 May 2025 - 22 Jul 2025
Time-limited parking restrictions temporary lifted.
Beverley St to Toronto St
Expected Duration: 14 May 2025 - 09 Jun 2025
Eastbound median lane, westbound left turn storage lane, closed for gas work.
Cecil St to Bangor Av
Expected Duration: 28 May 2025 - 23 Jun 2025
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
Hargrave St to Carlton St
Expected Duration: 14 May 2025 - 09 Jun 2025
Westbound median lane, closed for gas work.
McGee St to Maryland St
Expected Duration: 08 May 2025 - 08 May 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Ellice Av
Expected Duration: 21 Jun 2025 - 21 Jun 2025
All westbound lanes, north side sidewalk, south side sidewalk, closed for film production or special event/festival. All westbound lanes will be open for morning rush hour.
Young St to Furby St
Expected Duration: 04 Jun 2025 - 17 Jun 2025
Westbound median lane, closed for street construction/maintenance.
Nadeau St to Maisonneuve St
Expected Duration: 21 Apr 2025 - 23 Jun 2025
Westbound curb lane, closed for sewer work.
Thibault St to Langevin St
Expected Duration: 16 Jun 2025 - 16 Jun 2025
All eastbound lanes, all westbound lanes, closed for film production or special event/festival. All eastbound lanes will be open for morning rush hour. All westbound lanes will be open for morning rush hour.
Thibault St to St Jean Baptiste St
Expected Duration: 12 May 2025 - 06 Jun 2025
All lanes will be closed intermittently for street construction/maintenance between the posted dates. Local traffic will be maintained.
Eagle Dr to Egesz St
Expected Duration: 11 Jun 2025 - 17 Jun 2025
Eastbound left turn storage lane, westbound left turn storage lane, partially closed for water work in the centre median.
Academy Rd to Kingsway
Expected Duration: 19 May 2025 - 20 Jun 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for water work.
Golspie St to Dundoon St
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Back lane/public lane, closed for street construction/maintenance.
Golspie St to Watt St
Expected Duration: 11 May 2025 - 09 Jun 2025
Westbound curb lane, closed for sewer work.
Eccles St to Darling St
Expected Duration: 09 Jun 2025 - 11 Jun 2025
Eastbound curb lane, closed for building construction/maintenance.
Hay St to Osborne St
Expected Duration: 08 Jun 2025 - 09 Jun 2025
Westbound curb lane, closed for film production or special event/festival.
Waterford Green Cmn to Dr Jose Rizal Wy
Expected Duration: 05 May 2025 - 13 Jun 2025
Eastbound curb lane, westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Baltimore Rd to Rathgar Av
Expected Duration: 09 Jun 2025 - 09 Jun 2025
East side sidewalk, west side sidewalk, closed for film production or special event/festival.
Bartlet Av to Morley Av
Expected Duration: 14 Apr 2025 - 28 Nov 2025
East side sidewalk, closed for building construction/maintenance.
Gertrude Av to Wardlaw Av
Expected Duration: 13 Feb 2025 - 13 Feb 2025
Northbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Morley Av to Arnold Av
Expected Duration: 02 Dec 2024 - 20 Feb 2026
Parking removal on northbound curb lane for Winnipeg Transit.
Roslyn Rd to Osborne Bridge
Expected Duration: 28 Apr 2025 - 25 Jul 2025
East side sidewalk, closed for building construction/maintenance.
Stradbrook Av to Wardlaw Av
Expected Duration: 31 Mar 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
Weston St to McPhillips St
Expected Duration: 27 May 2025 - 16 Jun 2025
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Eastbound curb lane will be open for morning and afternoon rush hours.
Keewatin St to Worth St
Expected Duration: 28 May 2025 - 23 Jun 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for water work.
Clyde Rd to Talbot Av
Expected Duration: 29 Nov 2024 - 03 Dec 2024
Southbound curb lane, closed for sewer work. Southbound curb lane will be open for morning rush hour.
Munroe Av to Keenleyside St
Expected Duration: 29 May 2025 - 20 Jun 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance.
Ness Av to Portage Av
Expected Duration: 07 May 2025 - 12 Jun 2025
All southbound lanes, all northbound lanes, west side sidewalk, closed for sewer work.
Lansdowne Av to Inkster Bv
Expected Duration: 12 May 2025 - 15 Aug 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for street construction/maintenance.
Notre Dame Av to McDermot Av
Expected Duration: 21 May 2025 - 16 Jun 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Ravelston Av W to El Tassi Dr
Expected Duration: 16 Jun 2025 - 20 Jun 2025
Southbound curb lane and west side multi-use path, closed for gas work. Southbound curb lane will be open for morning and afternoon rush hours.
Adamar Rd to Chancellor Dr
Expected Duration: 12 May 2025 - 28 Nov 2025
Reconstruction of Pembina Hwy & Abinojii Mikanah. Multiple lanes closed. West sidewalk and Southbound Painted bike lane closed. Follow detours. Sat, May 24 - Sun, May 25: Intermittent (<10 Mins) complete closure of all lanes from 12AM-6AM for overhead work.
At Des Trappistes St
Expected Duration: 10 Jun 2025 - 13 Jun 2025
Northbound left turn storage lane, closed for street construction/maintenance.
Ducharme Av to Grandmont Bv
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Northbound left turn storage lane, southbound median lane, closed for sewer work.
Grandmont Bv to Cloutier Dr
Expected Duration: 09 Jun 2025 - 17 Jun 2025
Northbound median lane, southbound curb lane, closed for sewer work.
Grandmont Bv to Ducharme Av
Expected Duration: 16 Jun 2025 - 04 Jul 2025
Southbound curb lane, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Pembina Hw LaSalle River Bridge to Perreault Av
Expected Duration: 12 May 2025 - 17 Oct 2025
Northbound median lane, southbound median lane, closed for street construction/maintenance. Width Restriction: 3.7m, northbound overwidth detour via PR210 to PTH59, southbound overwidth detour via PTH100
University Cr to Chevrier Bv
Expected Duration: 15 Jun 2025 - 15 Jun 2025 03:00 p.m.
Northbound curb lane, closed for film production or special event/festival.
Turnbull Dr to De Leglise Av
Expected Duration: 28 Apr 2025 - 08 Aug 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Width Restriction: 3.7m, northbound overwidth detour via PR210 to PTH59
Pembina Hw to Abinojii Mikanah
Expected Duration: 19 May 2025 - 30 Jun 2025
Southbound Pembina Hwy to Eastbound Abinojii Mikanah exit/ramp closed. Use alternate routes.
Verbena St to Viola St
Expected Duration: 11 Jun 2025 - 18 Jul 2025
Westbound curb lane, closed for water work.
De La Seigneurie Bv to Quayside Cv
Expected Duration: 29 May 2025 - 30 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work.
Gilia Dr to Buttercup Av
Expected Duration: 11 Jun 2025 - 18 Jul 2025
Southbound curb lane, closed for water work.
Camiel Sys St to Dugald Rd
Expected Duration: 12 May 2025 - 20 Jun 2025
Northbound curb lane, closed for street construction/maintenance.
Dugald Rd to Camiel Sys St
Expected Duration: 05 May 2025 - 30 May 2025
Southbound median lane, closed for street construction/maintenance.
St Boniface Rd to Symington Rd W
Expected Duration: 02 Jun 2025 - 13 Jun 2025
Southbound left turn storage lane, closed for street construction/maintenance.
Meadowood Dr to End
Expected Duration: 15 May 2025 - 20 Jun 2025
All southbound lanes, closed for water work.
Inkster Bv to Church Av
Expected Duration: 27 May 2025 - 09 Oct 2025
Northbound curb lane, closed for film production or special event/festival.
Somerville Av to Somerset Av
Expected Duration: 27 May 2025 - 30 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Main St to St Cross St
Expected Duration: 01 Jun 2025 - 01 Jul 2025
Eastbound curb lane, closed for water work.
McKenzie St to Andrews St
Expected Duration: 02 Jun 2025 - 24 Oct 2025
All eastbound lanes, all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
McPhillips St to Airlies St
Expected Duration: 26 May 2025 - 13 Jun 2025
Northbound curb lane, eastbound curb lane, southbound curb lane, closed for sewer work.
Brazier St to Henderson Hw
Expected Duration: 13 Jun 2025 - 14 Jun 2025
Complete closure of all westbound lanes, closed for film production or special event/festival.
Arlington St to Wall St
Expected Duration: 23 May 2025 - 18 Jun 2025
Westbound middle lane 2, westbound middle lane, closed for sewer work.
Ashburn St to Strathcona St
Expected Duration: 27 May 2025 - 23 Jun 2025
Westbound curb lane, north side sidewalk, closed for water work.
Aubrey St to Lipton St
Expected Duration: 07 Jan 2025 - 08 Jan 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Aubrey St to Sherburn St
Expected Duration: 12 May 2025 - 16 Jun 2025
Back lane/public lane, closed for sewer work. Back lane/Public lane will be open for morning and afternoon rush hours.
David St to Muriel St
Expected Duration: 12 May 2025 - 09 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Edmonton St to Kennedy St
Expected Duration: 21 Jun 2025 - 22 Jun 2025
Westbound curb lane, westbound middle lane, westbound middle lane 2, north side sidewalk, closed for building construction/maintenance. All lanes open for peak hours.
Fort St to Main St
Expected Duration: 04 Dec 2024 - 01 Jul 2025
Pedestrians: North side sidewalk, South side sidewalk, closed for street construction/maintenance. Mon, May 26 - Mon, June 2: - Eastbound curb lane (First right-turn lane closest to curb) & eastbound median lane (left-turning lane closest to median) closed. Westbound curb lane closed. Westbound median lane closed between 9:00-15:00. Tues, June 3 - Fri, June 6: - Eastbound curb lane (First right-turn lane closest to curb) & eastbound median lane (left-turning lane closest to median) closed. Westbound median lane closed. Sat, June 7 - Sun, June 8: - Eastbound curb lane (First right-turn lane closest to curb) & eastbound median lane (left-turning lane closest to median) closed. Westbound curb lane closed. Westbound median lane closed between 9:00-15:00. Mon, June 9 - Tues, June 10: -Eastbound curb lane and Eastbound middle through lane closed. Westbound curb lane closed. Wed, June 11 - TBD: -Eastbound middle-left turning lane closed. Westbound middle lane closed.
Hargrave St to Carlton St
Expected Duration: 12 May 2025 - 31 Jul 2025
Westbound curb lane, westbound shoulder lane, north side sidewalk, closed for building construction/maintenance.
Marjorie St to Parkview St
Expected Duration: 08 May 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
McGee St to Huntleigh St
Expected Duration: 29 Jul 2020 - 30 Jun 2025
North side sidewalk, closed for building construction/maintenance.
Moorgate St to Sharp Bv
Expected Duration: 07 Mar 2025 - 31 Oct 2025
Patio installed on the north sidewalk; pedestrian access remains open.
Muriel St to Cavalier Dr
Expected Duration: 04 Jun 2025 - 11 Jun 2025
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
Queen St to Riverbend Cr
Expected Duration: 02 Jun 2025 - 23 Jun 2025
Eastbound curb lane, closed for gas work.
Simcoe St to Beverley St
Expected Duration: 16 May 2025 - 16 May 2025
Back lane/public lane, closed for communications work. Back lane/Public lane will be open for morning and afternoon rush hours.
Strathcona St to Empress St
Expected Duration: 18 Jun 2025 - 19 Jun 2025
Westbound curb lane, westbound middle lane, closed for electrical/lighting/signals work.
Strathcona St to Sherbrook St
Expected Duration: 05 Jun 2025 - 27 Jun 2025
Eastbound curb lane, south side sidewalk, closed for communications work. Eastbound curb lane will be open for morning and afternoon rush hours.
Traill Av to Strathmillan Rd
Expected Duration: 06 Jun 2025 - 30 Jun 2025
Eastbound median lane, westbound curb lane, westbound median lane, closed for water work. Eastbound median lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours. Westbound median lane will be open for morning and afternoon rush hours.
Woodlands Cr to Harris Bv
Expected Duration: 03 Jun 2025 - 16 Jun 2025
Eastbound curb lane, eastbound middle lane, eastbound middle lane 2, eastbound median lane, closed for water work. Two eastbound lanes will remain open at all times.
Main St to Westbrook St
Expected Duration: 26 Jul 2024 - 22 May 2026
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance.
Main St to Westbrook St
Expected Duration: 15 Oct 2024 - 26 Aug 2025
South side sidewalk, closed for loading/unloading.
Westbrook St to Main St
Expected Duration: 10 Dec 2024 - 01 Jul 2025
Pedestrians: South side sidewalk closed for street construction/maintenance. Eastbound Lane Closures: - Sat, March 29 - Sun, June 8: - Eastbound curb lane closed. - Mon, June 9 - Tues, June 10: - All eastbound lanes closed. Use alternate routes. - Wed, June 11 - TBD: - Eastbound middle lane closed. Westbound Lane Closures: - Mon, May 26 - Mon, June 2: - Westbound curb lane (Right-turn lane closest to curb) closed. Westbound median lane closed between 9:00 - 15:00. - Tues, June 3 - Fri, June 6: - Westbound median lane closed. - Sat, June 7- Sun, June 8: - Westbound curb lane (Right-turn lane closest to curb) closed. Westbound median lane closed between 9:00 - 15:00. - Mon, June 9 - Tues, June 10: - Westbound curb lane (Right-turn lane closest to curb) closed. - Wed, June 11 - TBD: Westbound middle lane closed.
Taylor Av to Cambridge St
Expected Duration: 09 Jun 2025 - 29 Aug 2025
Northbound curb lane, closed for sewer work.
Atlantic Av to Bannerman Av
Expected Duration: 17 May 2025 - 08 Jun 2025
All southbound lanes, all northbound lanes, closed for sewer work.
Burrin Av to Semple Av
Expected Duration: 03 Apr 2025 - 13 Jun 2025
Southbound curb lane, closed for sewer work.
Kingsbury Av to Royal Av
Expected Duration: 28 Apr 2025 - 13 Jun 2025
Northbound curb lane, closed for sewer work.
Semple Av to Kilbride Av
Expected Duration: 31 Jan 2025 - 13 Jun 2025
Southbound curb lane, closed for sewer work.
James Av to William Av
Expected Duration: 23 Feb 2024 - 16 Jul 2025
East side sidewalk, closed for building construction/maintenance.
Logan Av to Higgins Av
Expected Duration: 22 May 2025 - 13 Jun 2025
Southbound median lane, west side sidewalk, east side sidewalk, closed for electrical/lighting/signals work. Southbound median lane will be open for morning and afternoon rush hours.
Leo Novak St to Railway St
Expected Duration: 09 Jun 2025 - 11 Jun 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for sewer work. Eastbound curb lane will be open for morning and afternoon rush hours. Westbound curb lane will be open for morning and afternoon rush hours.
Salter St to Powers St
Expected Duration: 21 Apr 2025 - 20 Jun 2025
North side sidewalk, closed for building construction/maintenance.
Waterfront Dr to Tache Av
Expected Duration: 17 Jun 2025 - 18 Jun 2025
Eastbound median lane, westbound median lane, closed for electrical/lighting/signals work. Eastbound median lane will be open for morning and afternoon rush hours. Westbound median lane will be open for morning and afternoon rush hours.
Des Meurons to Archibald St
Expected Duration: 11 Mar 2025 - 14 Mar 2025
Eastbound median lane, eastbound curb lane, south side sidewalk, closed for sewer work. Only one eastbound lane to be closed at a time. Eastbound median lane and Eastbound curb lane will be open for morning and afternoon rush hours.
St Joseph St to Langevin St
Expected Duration: 03 Jun 2025 - 30 Jun 2025
Alternating closure of an Eastbound lane and the backlane closed for electrical/lighting/signals work. All lanes open for peak hours.
St Joseph St to Tache Av
Expected Duration: 13 Jun 2025 - 27 Jun 2025
North side sidewalk, closed for building construction/maintenance.
St Joseph St to Tache Av
Expected Duration: 10 Jun 2025 - 10 Jun 2025
Eastbound curb lane, eastbound middle lane, south side sidewalk, closed for building construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours. Eastbound middle lane will be open for morning and afternoon rush hours.
St Joseph St to Tache Av
Expected Duration: 06 May 2025 - 09 Jun 2025
Back lane/public lane, closed for gas work. Back lane/Public lane will be open for morning and afternoon rush hours.
Tache Av to Langevin St
Expected Duration: 12 May 2025 - 27 Jun 2025
Westbound curb lane, eastbound curb lane, south side sidewalk crossing, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Tache Av to St Joseph St
Expected Duration: 02 Jan 2024 - 30 May 2025
South side sidewalk, closed for street construction/maintenance.
Carlton St to Hargrave St
Expected Duration: 12 May 2025 - 13 Jun 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Norwood Bridge to Main Street Bridge
Expected Duration: 24 May 2025 - 27 Jun 2025
Northbound middle lane, northbound middle lane 2, closed for water work.
Corydon Av to Fleet Av
Expected Duration: 16 Jun 2025 - 18 Jun 2025
Southbound curb lane, closed for building construction/maintenance.
Grosvenor Av to Corydon Av
Expected Duration: 30 May 2025 - 30 Jun 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for water work.
Grosvenor Av to Kingsway
Expected Duration: 27 May 2025 - 30 Jun 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for water work.
Dobbie Av to Kimberly Av
Expected Duration: 05 Jun 2025 - 07 Jun 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Winona St to Bond St
Expected Duration: 14 May 2025 - 27 Jun 2025
All eastbound lanes, all westbound lanes, south side sidewalk, closed for sewer work.
Brewster St to Hoka St
Expected Duration: 05 Jun 2025 - 04 Jul 2025
Eastbound curb lane, closed for street construction/maintenance.
End to Mazenod Rd
Expected Duration: 10 Jun 2025 - 17 Jun 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. Only one lane closed at a time.
Main St to Redwood Bridge
Expected Duration: 21 Jun 2025 - 23 Jun 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Salter St to Charles St
Expected Duration: 26 May 2025 - 12 Jun 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Day St to Wayoata St
Expected Duration: 07 Jun 2025 - 07 Jun 2025
All eastbound lanes, all westbound lanes, closed for film production or special event/festival. All eastbound lanes will be open for morning and afternoon rush hours. All westbound lanes will be open for morning and afternoon rush hours.
Lagimodiere Bv to Panet Rd
Expected Duration: 28 May 2025 - 13 Jun 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Plessis Rd to Winona St
Expected Duration: 07 Jun 2025 - 07 Jun 2025
All eastbound lanes, all westbound lanes, closed for film production or special event/festival. All eastbound lanes will be open for morning and afternoon rush hours. All westbound lanes will be open for morning and afternoon rush hours.
Winona St to Day St
Expected Duration: 05 Jun 2025 - 08 Jun 2025
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for film production or special event/festival.
Jaymorr Dr to Fairway Pl
Expected Duration: 26 Mar 2025 - 27 Mar 2025
All southbound lanes, all northbound lanes, closed for sewer work.
At Buckingham Rd
Expected Duration: 09 Jun 2025 - 13 Jun 2025
All westbound lanes, all eastbound lanes, closed for street construction/maintenance.
St Marys Rd to Glen Meadow St
Expected Duration: 21 Feb 2025 - 28 Feb 2025
Westbound curb lane, closed for building construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Tache Av to End
Expected Duration: 16 Jun 2025 - 20 Jun 2025
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
At Arctic St
Expected Duration: 12 May 2025 - 19 Dec 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance.
Bole St to Osborne St
Expected Duration: 13 Jun 2025 - 13 Jun 2025
Westbound curb lane, westbound protected bike lane, north side sidewalk, closed for building construction/maintenance. Westbound curb lane to be used as a protected bike diversion. All lanes to be open during peak hours.
Avalon Rd to Blackmore Av
Expected Duration: 21 May 2025 - 21 Jun 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for water work.
Byng Pl to Windermere Av
Expected Duration: 10 May 2025 - 09 Jun 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for water work.
Pandora Av E to Melrose Av E
Expected Duration: 12 May 2025 - 31 Jul 2025
All northbound lanes, all southbound lanes, north side sidewalk, south side sidewalk, closed for street construction/maintenance. One sidewalk will remain open at all times during construction.
Sutherland Av to Jarvis Av
Expected Duration: 26 May 2025 - 18 Jul 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for street construction/maintenance.
Dieppe Rd to Buckingham Rd
Expected Duration: 12 Jun 2025 - 25 Jun 2025
Eastbound curb lane, westbound median lane, south side sidewalk, closed for sewer work.
Greenbrier Av to Pepperloaf Cr
Expected Duration: 12 Jun 2025 - 25 Jun 2025
Eastbound median lane, eastbound left turn storage lane, closed for sewer work.
Lannoo Dr to William Marshall Wy
Expected Duration: 12 Jun 2025 - 25 Jun 2025
Westbound median lane, closed for sewer work.
Bannatyne Av to McDermot Av
Expected Duration: 01 Nov 2024 - 31 Aug 2025
East side sidewalk, closed for building construction/maintenance.
Daly St S to Cockburn St S
Expected Duration: 24 May 2025 - 24 Jun 2025
All eastbound lanes, all westbound lanes, closed for water work. All eastbound lanes will be open for morning and afternoon rush hours. All westbound lanes will be open for morning and afternoon rush hours.
Bryce St to End
Expected Duration: 16 Jun 2025 - 11 Jul 2025
All eastbound lanes, closed for sewer work. No access to Bryce St. Local traffic maintained.
Bryce St to Osborne St
Expected Duration: 16 Jun 2025 - 30 Nov 2025
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Isabel St to Sherbrook St
Expected Duration: 14 Jun 2025 07:00 a.m. - 14 Jun 2025 05:00 p.m.
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for film production or special event/festival.
Sherbrook St to Isabel St
Expected Duration: 12 Jun 2025 - 12 Jun 2025
All eastbound lanes, all westbound lanes, closed for block party.
Sherbrook St to Tecumseh St
Expected Duration: 01 Jun 2025 - 01 Jul 2025
Westbound curb lane, closed for water work.
Keewatin St to Worth St
Expected Duration: 07 Feb 2025 - 28 Feb 2025
Westbound curb lane, closed for loading/unloading.
Salter St to Aikins St
Expected Duration: 11 Jun 2025 - 18 Jun 2025
Eastbound curb lane, closed for landscaping/tree maintenance.
Salter St to Andrews St
Expected Duration: 11 Mar 2025 - 13 Jun 2025
Westbound curb lane, closed for sewer work.
Portage Av to Westminster Av
Expected Duration: 19 Dec 2024 - 11 Jun 2025
Southbound curb lane, closed for loading/unloading.
At Snowdon Av
Expected Duration: 12 May 2025 - 01 Aug 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. One lane to remain open for local access.
Main St to Lily St
Expected Duration: 22 Aug 2024 - 29 Aug 2025
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance.
Des Hivernants Bv to Blue Sun Dr
Expected Duration: 21 Sep 2023 - 01 Jul 2025
North side sidewalk, closed for building construction/maintenance.
Anderson Av to St Johns Av
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Southbound median lane, northbound median lane, closed for sewer work.
Magnus Av to Alfred Av
Expected Duration: 11 Jun 2025 - 30 Jun 2025
Northbound curb lane, east side sidewalk, closed for communications work. Northbound curb lane will be open for morning and afternoon rush hours.
Rouge Rd to Whitegates Cr
Expected Duration: 05 Jun 2025 - 06 Jun 2025
North side sidewalk, closed for electrical/lighting/signals work.
Furby St to End
Expected Duration: 06 Jun 2025 - 06 Jun 2025
All eastbound lanes, all westbound lanes, closed for film production or special event/festival. All eastbound lanes will be open for morning and afternoon rush hours. All westbound lanes will be open for morning and afternoon rush hours.
Empress St to Strathcona St
Expected Duration: 06 May 2025 - 19 Jun 2025
All eastbound lanes, closed for water work.
Furby St to Langside St
Expected Duration: 06 Jun 2025 - 27 Jun 2025
Eastbound curb lane, closed for street construction/maintenance.
King Edward St to Century St
Expected Duration: 29 May 2025 - 23 Jun 2025
Eastbound curb lane, south side sidewalk, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Lipton St to Sherburn St
Expected Duration: 04 May 2025 - 14 May 2025
Westbound median lane, closed for water work. Westbound median lane will be open for morning and afternoon rush hours.
Spruce St to Clifton St
Expected Duration: 23 May 2025 - 16 Jun 2025
Eastbound curb lane, eastbound median lane, westbound curb lane, westbound median lane, south side sidewalk, closed for water work. One lane to remain open in each direction at all times.
Spruce St to Valour Rd
Expected Duration: 13 Jun 2025 - 13 Jun 2025
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Westbound curb lane will be open for morning and afternoon rush hours.
Sherwin Rd to King Edward St
Expected Duration: 29 May 2025 - 23 Jun 2025
All eastbound lanes, closed for water work.
Newton Av to Armstrong Av
Expected Duration: 16 Jun 2025 - 01 Aug 2025
Northbound curb lane, closed for water work.
Harrow St to Guelph St
Expected Duration: 15 Jun 2025 - 15 Jun 2025
All eastbound lanes, all westbound lanes, closed for block party.
At River Av
Expected Duration: 26 May 2025 - 13 Jun 2025
East side sidewalk, closed for building construction/maintenance.
Battery St to Sgt Tommy Prince St
Expected Duration: 07 May 2025 - 09 Jun 2025
Westbound curb lane, south side sidewalk, closed for water work.
Charles St to King St
Expected Duration: 14 May 2025 - 09 Jun 2025
Eastbound curb lane, closed for gas work.
Sinclair St to Arlington St
Expected Duration: 12 May 2025 - 09 Jun 2025
Eastbound curb lane, south side sidewalk, closed for water work. Eastbound curb lane will be open for morning and afternoon rush hours.
Powers St to McGregor St
Expected Duration: 06 Jan 2025 - 13 Jun 2025
Westbound curb lane, closed for sewer work.
Salter St to Andrews St
Expected Duration: 03 Apr 2025 - 13 Jun 2025
Westbound curb lane, closed for sewer work.
Newcombe Cr to Cliffwood Dr
Expected Duration: 12 May 2025 - 06 Jun 2025
All eastbound lanes, closed for street construction/maintenance.
Mapleglen Dr to Mapleton Dr
Expected Duration: 28 May 2025 - 13 Jun 2025
Southbound curb lane, northbound curb lane, southbound painted bike lane, closed for street construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours. Northbound curb lane will be open for morning and afternoon rush hours.
Ellice Av to Sargent Av
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Northbound curb lane, northbound painted bike lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Broadway
Expected Duration: 14 Apr 2025 - 30 Sep 2025
Northbound curb lane, back lane/public lane, northbound painted bike lane, east side sidewalk, closed for building construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Ellice Av
Expected Duration: 18 Feb 2025 - 12 May 2025
Alternating Northbound middle lane, northbound median lane, northbound middle lane 2, northbound curb lane, closed for sewer work. Only two NB vehicle lanes closed at a time. Northbound painted bike lane closed.
Portage Av to Ellice Av
Expected Duration: 14 Jan 2025 - 25 Jul 2025
Northbound median lane, closed for building construction/maintenance. Northbound median lane will be open for morning and afternoon rush hours.
Portage Av to Ellice Av
Expected Duration: 13 Jan 2025 - 30 Jun 2025
West side sidewalk, closed for building construction/maintenance.
Westminster Av to Sara Av
Expected Duration: 29 Mar 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
Wolever Av to St Matthews Av
Expected Duration: 23 May 2025 - 23 Jun 2025
All southbound lanes, all northbound lanes, east side sidewalk, closed for sewer work.
Wolever Av to Westminster Av
Expected Duration: 27 May 2025 - 13 Jun 2025
Only right-turns permitted from Sherburn St onto Portage Ave. East side crosswalk and west side crosswalk, closed for sewer work. Only one side crosswalk to be closed at a time.
Alexander Av to Logan Av
Expected Duration: 03 Jun 2025 - 27 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
Louelda St to Besant St
Expected Duration: 30 May 2025 - 26 Oct 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for street construction/maintenance.
Lansdowne Av to Inkster Bv
Expected Duration: 14 May 2025 - 15 Aug 2025
All lanes and sidewalks, closed for street construction/maintenance. Only one sidewalk to be closed at a time.
At Ellice Av
Expected Duration: 01 May 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
Navy Wy to Broadway
Expected Duration: 27 May 2025 - 12 Jun 2025
Northbound curb lane, east side sidewalk, west side sidewalk, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
St Mary Av to Graham Av
Expected Duration: 11 Jun 2025 - 11 Jun 2025
Northbound curb lane, northbound middle lane, east side sidewalk, closed for building construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours. Northbound middle lane will be open for morning and afternoon rush hours.
End to Markham Rd
Expected Duration: 12 Jun 2025 - 12 Jun 2025
Northbound curb lane, closed for film production or special event/festival.
Treger By to Molson St
Expected Duration: 12 May 2025 - 01 Aug 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. At least one lane to remain open for local access.
Wicklow St to Point Rd
Expected Duration: 27 May 2025 - 30 Jun 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for street construction/maintenance.
Chalfont Rd to End
Expected Duration: 12 May 2025 - 20 Jun 2025
All westbound lanes, closed for water work.
Elizabeth Rd to Baudoux Pl
Expected Duration: 14 Apr 2025 - 31 Oct 2025
Patio installed on the worth sidewalk; pedestrian access remains open.
Broadway to Portage Av
Expected Duration: 14 Jun 2025 - 14 Jun 2025
All northbound lanes, all southbound lanes, closed for block party.
Cox Bv to Norris Rd
Expected Duration: 22 May 2025 - 11 Jun 2025
All westbound traffic closed for emergency street construction/maintenance. Westbound traffic use Day St.
Graduate Pa to Henderson Hw
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Westbound median lane, closed for street construction/maintenance.
Lagimodiere Bv to Cox Bv
Expected Duration: 26 Aug 2024 - 22 Nov 2024
Eastbound curb lane, closed for street construction/maintenance.
Roderick St to Oxford St W
Expected Duration: 09 Jun 2025 - 20 Jun 2025
Eastbound shoulder lane, closed for street construction/maintenance.
Inman Av to St Marys Rd
Expected Duration: 08 May 2025 - 17 Oct 2025
Northbound curb lane, southbound curb lane, east side sidewalk, closed for street construction/maintenance.
Worthington Av to Hindley Av
Expected Duration: 28 May 2025 09:00 a.m. - 23 Jun 2025 03:00 p.m.
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Notre Dame St to Dumoulin St
Expected Duration: 16 Jun 2025 - 16 Jun 2025
All northbound lanes, all southbound lanes, closed for film production or special event/festival. All northbound lanes will be open for morning rush hour. All southbound lanes will be open for morning rush hour.
McKenzie St to McGregor St
Expected Duration: 08 May 2025 - 09 Jun 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for water work.
Carlton St to Edmonton St
Expected Duration: 09 Jul 2018 - 01 Sep 2025
Westbound curb lane, westbound painted bike lane, north side sidewalk, closed for building construction/maintenance.
Edmonton St to Kennedy St
Expected Duration: 17 May 2025 - 23 Jun 2025
Westbound curb lane, closed for sewer work.
Garry St to Smith St
Expected Duration: 10 Jun 2025 - 10 Jun 2025
Westbound curb lane, westbound painted bike lane, north side sidewalk, closed for building construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Smith St to Donald St
Expected Duration: 10 Oct 2024 - 01 May 2026
Westbound median lane, south side sidewalk, closed for building construction/maintenance.
At Redview Dr
Expected Duration: 09 Jun 2025 - 27 Jun 2025
Southbound curb lane closed for street construction/maintenance. All northbound traffic on Old St. Mary's Rd closed for street construction/maintenance.
Britannica Rd to Normand Park Dr
Expected Duration: 10 Feb 2025 - 01 Nov 2025
Southbound curb lane, closed for building construction/maintenance. Southbound curb lane will be open for morning and afternoon rush hours.
Carriere Av to Fifth Av
Expected Duration: 10 Jun 2025 - 11 Jun 2025
Southbound curb lane, west side sidewalk, closed for communications work.
Cromwell St to Ferndale Av
Expected Duration: 26 May 2025 - 31 Jul 2025
Southbound curb lane, southbound middle lane, west side sidewalk, closed for street construction/maintenance. Southbound middle lane will be open for morning and afternoon rush hours.
Fifth Av to Champlain St
Expected Duration: 05 May 2025 - 13 Jun 2025
Northbound curb lane, southbound median lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning rush hour. Southbound median lane will be open for afternoon rush hour.
Guay Av to Carriere Av
Expected Duration: 31 May 2025 - 30 Jun 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Northbound curb lane will be open for morning and afternoon rush hours.
Mager Dr E to Harrowby Av
Expected Duration: 08 May 2025 - 17 Oct 2025
Northbound curb lane, northbound middle lane, southbound left turn storage lane, southbound curb lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance. Northbound middle lane will be open for morning and afternoon rush hours. Southbound curb lane will be open for morning and afternoon rush hours. One sidewalk to remain accessible at all times.
Nichol Av to Glen Av
Expected Duration: 16 Jun 2025 - 20 Jun 2025
Northbound curb lane, closed for gas work. Northbound curb lane will be open for morning and afternoon rush hours.
St Vital Rd to Dakota St
Expected Duration: 04 Jun 2025 - 20 Jun 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. Northbound curb lane will be open for morning rush hour. Southbound curb lane will be open for afternoon rush hour.
Maryland St to Agnes St
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Westbound curb lane, closed for street construction/maintenance.
Nairn Av to McCalman Av
Expected Duration: 13 May 2025 - 30 Jun 2025
East side sidewalk, closed for building construction/maintenance.
Rathgar Av to Argue St
Expected Duration: 09 Jun 2025 - 04 Jul 2025
Westbound curb lane, closed for street construction/maintenance.
Sinclair St to Arlington St
Expected Duration: 18 May 2025 - 13 Jun 2025
All eastbound lanes, all westbound lanes, north side sidewalk, closed for water work.
Ashworth St to Homewood Dr
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Eastbound curb lane, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Portage Av to Wolseley Av
Expected Duration: 02 Jun 2025 - 30 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
Portage Av to Wolseley Av
Expected Duration: 03 Jun 2025 - 27 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
At Woodcott Pl
Expected Duration: 01 Jun 2025 - 01 Jul 2025
Southbound curb lane, closed for water work.
Nassau St N to Osborne St
Expected Duration: 28 May 2025 09:00 a.m. - 28 May 2025 03:00 p.m.
Eastbound median lane, north side sidewalk, closed for landscaping/tree maintenance. Eastbound median lane will be open for morning and afternoon rush hours.
Sargent Av to Wellington Av
Expected Duration: 27 May 2025 - 10 Jun 2025
Southbound curb lane, closed for loading/unloading.
Sturgeon Rd to Centreport Canada Wy
Expected Duration: 06 Jan 2025 - 30 Jun 2025
Northbound curb lane, closed for sewer work.
Emerald Grove Dr to Ness Av
Expected Duration: 02 Jun 2025 - 30 Jun 2025
Northbound shoulder lane, east side sidewalk, closed for street construction/maintenance.
Murray Park Rd to Woodgreen Pl
Expected Duration: 20 May 2025 - 27 Jun 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance.
Sturgeon Rd Crossing of Sturgeon Creek to Portage Av
Expected Duration: 03 Jun 2025 - 16 Jun 2025
Southbound left turn storage lane, closed for water work.
Tonka Point to Sturgeon Rd Crossing of Sturgeon Creek
Expected Duration: 23 Jan 2025 - 30 Jun 2025
Southbound right turn (yield) lane, closed for sewer work.
Tonka Point to Sturgeon Rd Crossing of Sturgeon Creek
Expected Duration: 24 Mar 2025 - 25 Jul 2025
Northbound shoulder lane, closed for water work. Northbound shoulder lane will be open for morning and afternoon rush hours.
At Gilmore Av
Expected Duration: 12 May 2025 - 30 Jun 2025
De La Seigneurie Bv to Desjardins Dr
Expected Duration: 26 May 2025 - 31 Oct 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Angus St to Higgins Av
Expected Duration: 23 May 2025 - 09 Jun 2025
All eastbound lanes, closed for street construction/maintenance.
Euclid Av to Annabella St
Expected Duration: 10 Jun 2025 - 12 Jun 2025
Eastbound curb lane, closed for street construction/maintenance.
Goulet St to Dollard Bv
Expected Duration: 16 Jun 2025 - 20 Jun 2025
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Southbound curb lane will be open for morning and afternoon rush hours.
Marion St to Horace St
Expected Duration: 25 Mar 2025 - 31 Oct 2025
Patio installed on the Northbound curb lane; pedestrian access remains open.
Mac St to Jones St
Expected Duration: 09 Jun 2025 - 23 Jun 2025
Eastbound curb lane, closed for sewer work.
Brock St to Ash St
Expected Duration: 03 Jun 2025 - 30 Jun 2025
Eastbound curb lane, closed for water work.
Centennial St to Lindsay St
Expected Duration: 12 May 2025 - 13 Jun 2025
Eastbound curb lane, eastbound median lane, westbound curb lane, westbound median lane, north side sidewalk, south side sidewalk, closed for street construction/maintenance. Only one lane in each direction to be closed at a time. Only one sidewalk to be closed at a time.
Poseidon By to Wilton St
Expected Duration: 12 May 2025 - 12 Jul 2025
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Bannatyne Av to McDermot Av
Expected Duration: 09 Sep 2024 - 30 Jun 2025
East side sidewalk, closed for building construction/maintenance.
McDermot Av to Bannatyne Av
Expected Duration: 30 May 2025 - 30 May 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for building construction/maintenance.
Daylan Marshall Gt to McPhillips St
Expected Duration: 28 May 2025 - 30 Jun 2025
Eastbound curb lane, south side sidewalk, closed for communications work. Eastbound curb lane will be open for morning and afternoon rush hours.
Notre Dame St to Dumoulin St
Expected Duration: 16 Jun 2025 - 16 Jun 2025
All northbound lanes, all southbound lanes, closed for film production or special event/festival.
Portage Av to Nightingale Rd
Expected Duration: 17 Apr 2025 - 31 Oct 2025
Patio installed on the east sidewalk; pedestrian access remains open.
Ellice Av to Sargent Av
Expected Duration: 20 May 2025 - 16 Jun 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for water work.
Gilmore Av to Summerfield Wy
Expected Duration: 12 May 2025 - 30 Jun 2025
Samantha Pl to Farlinger By
Expected Duration: 04 Jun 2025 - 30 Jun 2025
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for street construction/maintenance.
Pembina Hw to End
Expected Duration: 20 May 2025 - 04 Jul 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Girton Bv to Corydon Av
Expected Duration: 10 Jun 2025 - 12 Jun 2025
Southbound curb lane, closed for water work. Southbound curb lane will be open for morning and afternoon rush hours.
Kenaston Bv to Doncaster St
Expected Duration: 06 Jun 2025 - 27 Jun 2025
Eastbound curb lane, westbound median lane, closed for sewer work. Eastbound curb lane will be open for morning and afternoon rush hours.
Chancellor Matheson Rd to Pembina Hw
Expected Duration: 15 Jun 2025 - 15 Jun 2025 03:00 p.m.
No cars, just cardio. All lanes closed for the Manitoba Marathon.
Dafoe Rd to Markham Rd
Expected Duration: 12 Jun 2025 - 12 Jun 2025
Road will be open, but permit allows for Bomber team to control ingress & egress. All repurposing plans made in coordination with Public Works Traffic Services.
Dysart Rd to Thatcher Dr
Expected Duration: 21 Apr 2025 - 04 Jul 2025
All northbound lanes, east sidewalk closed for street construction/maintenance. Median Crossover to provide 1 NB & 1 SB travel lanes.
Riddle Av to Wolever Av
Expected Duration: 16 Apr 2025 - 16 Jun 2025
All northbound lanes, all southbound lanes, closed for water work.
Sargent Av to Wellington Av
Expected Duration: 13 Jun 2025 - 13 Jun 2025
Northbound curb lane, east side sidewalk, closed for electrical/lighting/signals work. Northbound curb lane will be open for morning and afternoon rush hours.
Gilia Dr to Buttercup Av
Expected Duration: 11 Jun 2025 - 18 Jul 2025
Southbound curb lane, closed for water work.
Ducharme Av to Gendreau Av
Expected Duration: 07 Jun 2025 - 04 Jul 2025
All northbound lanes, all southbound lanes, closed for water work.
Arrowwood Dr N to Canna Bv
Expected Duration: 03 Jun 2025 - 08 Jul 2025
Northbound curb lane, closed for sewer work.
Wyoming St to Iowa St
Expected Duration: 02 Jun 2025 - 20 Jun 2025
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Westbound curb lane will be open for morning and afternoon rush hours.
Pandora Av E to Regent Av E
Expected Duration: 12 May 2025 - 31 Jul 2025
Northbound curb lane, southbound curb lane, north side sidewalk, south side sidewalk, closed for street construction/maintenance. One sidewalk to remain open at all times.
Portage Av to Wolever Av
Expected Duration: 21 May 2025 - 16 Jun 2025
Northbound median lane, west side sidewalk, closed for street construction/maintenance.
Donnelly St to Marshall Cr
Expected Duration: 20 May 2025 - 16 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
Lyndale Dr to Lawndale Av
Expected Duration: 08 Jun 2025 - 08 Jun 2025
All eastbound lanes, all westbound lanes, closed for film production or special event/festival. All eastbound lanes will be open for afternoon rush hour. All westbound lanes will be open for afternoon rush hour.
Osborne St to Scott St
Expected Duration: 17 Mar 2025 - 30 Apr 2025
South side sidewalk, closed for building construction/maintenance.
Pembina Hw to Wicklow St
Expected Duration: 05 May 2025 - 31 Jul 2025
Temporary accessible parking spot installed in the Eastbound curb lane during reconstruction of Wicklow St.
Bannatyne Av to James Av
Expected Duration: 30 Mar 2025 - 31 Oct 2025
Patio installed on the west sidewalk; pedestrian access remains open.
Bannatyne Av to Pacific Av
Expected Duration: 04 Jun 2025 - 11 Jun 2025
East side sidewalk, closed for film production or special event/festival.
Pioneer Av to Lombard Av
Expected Duration: 06 Jun 2025 05:00 p.m. - 06 Jun 2025 11:00 p.m.
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Archibald St to Nairn Av
Expected Duration: 03 Jun 2025 - 30 Jun 2025
Northbound curb lane, east side sidewalk, closed for street construction/maintenance.
Kimberly Av to Bronx Av
Expected Duration: 29 May 2025 - 12 Jun 2025
Southbound curb lane, west side sidewalk, closed for street construction/maintenance.
Thames Av to Chalmers Av
Expected Duration: 06 Oct 2023 - 31 Jul 2025
East side sidewalk, closed for building construction/maintenance.
Thames Av to Chalmers Av
Expected Duration: 23 Aug 2023 - 30 Jun 2025
Northbound curb lane, east side sidewalk, closed for loading/unloading. Lanes will be open for morning and afternoon rush hours.
Chevrier Bv to Scurfield Bv
Expected Duration: 24 May 2025 - 18 Jun 2025
Northbound curb lane, closed for sewer work.
Kenaston Bv to Eaglewood Dr
Expected Duration: 06 May 2025 - 19 Jun 2025
Eastbound shoulder lane, westbound shoulder lane, south side sidewalk, north side sidewalk, closed for street construction/maintenance. All lanes to be open for peak hours. Only one sidewalk to be closed at a time.
Strathcona St to Burnell St
Expected Duration: 09 Jun 2025 - 30 Jun 2025
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Eastbound curb lane will be open for morning and afternoon rush hours.
Toronto St to Victor St
Expected Duration: 15 May 2025 - 08 Jun 2025
Westbound curb lane, north side sidewalk, closed for sewer work.
Blanchard Av to Middle Gate
Expected Duration: 02 Jun 2025 - 30 Jun 2025
All northbound lanes, all southbound lanes, west side sidewalk, closed for street construction/maintenance.
Cornish Av to Middle Gate
Expected Duration: 31 May 2025 - 28 Sep 2025
Two Hour parking restrictions temporarily lifted to accommodate road construction in the area.
At Dale Bv
Expected Duration: 20 Jun 2025 - 22 Aug 2025
All eastbound lanes, all westbound lanes, closed for street construction/maintenance.
Walnut St to Sherbrook St
Expected Duration: 23 May 2025 - 06 Jun 2025
Back lane/public lane, eastbound protected bike lane, south side sidewalk, closed for street construction/maintenance.
At Cottonwood Rd
Expected Duration: 26 May 2025 - 31 Oct 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Tamarind Dr to End
Expected Duration: 16 May 2025 - 14 Jun 2025
Westbound curb lane, closed for street construction/maintenance.
Crossgate Rd to Redonda St
Expected Duration: 05 Jun 2025 - 18 Jul 2025
Eastbound curb lane, closed for street construction/maintenance.
Dowker Av to End
Expected Duration: 11 Jun 2025 - 09 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
Dowker Av to Waterford Av
Expected Duration: 14 May 2025 - 31 Jul 2025
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Waterford Av to Somerset Av
Expected Duration: 12 May 2025 - 22 Jul 2025
All northbound lanes, all southbound lanes, closed for street construction/maintenance.
End to Lansdowne Av
Expected Duration: 02 Jun 2025 - 15 Aug 2025
All northbound lanes, all southbound lanes, east side sidewalk, closed for street construction/maintenance.
Gertie St to Ellen St
Expected Duration: 14 May 2025 - 09 Jun 2025
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work.
Harriet St to Isabel St
Expected Duration: 12 May 2025 - 09 Jun 2025
Westbound curb lane, closed for gas work.
Lydia St to Kate St
Expected Duration: 14 May 2025 - 09 Jun 2025
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Eastbound curb lane will be open for morning and afternoon rush hours.
Tecumseh St to Sherbrook St
Expected Duration: 10 Mar 2025 - 10 Mar 2025
Eastbound curb lane, south side sidewalk, closed for loading/unloading. Eastbound curb lane will be open for morning and afternoon rush hours.
Roblin Bv to Grant Av
Expected Duration: 20 May 2025 - 27 Jun 2025
Southbound right turn (yield) lane, closed for street construction/maintenance.
Carpathia Rd to Kenaston Bv
Expected Duration: 29 Apr 2025 - 20 Jun 2025
Westbound curb lane, closed for loading/unloading.
McPhillips St to Arlington St
Expected Duration: 12 May 2025 - 09 Jun 2025
All eastbound lanes, all westbound lanes, closed for sewer work.
Regent Av W to Victoria Av W
Expected Duration: 05 Jun 2025 - 07 Jun 2025
Northbound curb lane, closed for film production or special event/festival.
Dominion St to Greenwood Pl
Expected Duration: 11 Apr 2025 - 06 Jun 2025
Sherburn St to Dominion St
Expected Duration: 09 Apr 2025 - 13 Jun 2025
Westbound curb lane, closed for sewer work.
Gascon Rd to Bramton St
Expected Duration: 04 Jun 2025 - 20 Jun 2025
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Eastbound curb lane will be open for morning and afternoon rush hours.
St Marys Rd to Eric St
Expected Duration: 09 Jun 2025 - 13 Jun 2025
Eastbound curb lane, closed for gas work. Eastbound curb lane will be open for morning and afternoon rush hours.
Ainsdale Wy to Baxter By
Expected Duration: 20 May 2025 - 31 Jul 2025
Back lane/public lane, closed for street construction/maintenance.
Alexander Av to Pacific Av
Expected Duration: 20 May 2025 - 13 Jun 2025
Northbound curb lane, closed for street construction/maintenance.
Broadway to End
Expected Duration: 18 Apr 2025 - 16 Jun 2025
All southbound lanes, closed for water work.
Ellice Av to Portage Av
Expected Duration: 08 Dec 2022 - 30 Nov 2024
Northbound median lane, west side sidewalk, closed for building construction/maintenance.